Che Daud, Ahmad Rifai’e
(2014)
Piling works at Pasir Puteh Sentral ( PPS ) / Ahmad Rifai’e Che Daud.
Industrial Training.
Universiti Teknologi MARA, Perak.
(Unpublished)
Abstract
This report briefly describes the process and methods involved in piling works. It is produced based on the experience of the past five months stationed at the site project. This report is divided by sections and start with the background of the construction project. The observation found that the piling works is not easy as it looks. It involves many parties and professionals to manage the piling works. In this report, it contains all the piling works that occurred at site. Describing in more details about the process and methods of piling including the pile size, type of pile used, pile shoe, followed by foundation details. This report also includes all the problems and how to solve the problem ( recommendation ).
Metadata
Item Type: | Monograph (Industrial Training) |
---|---|
Creators: | Creators Email / ID Num. Che Daud, Ahmad Rifai’e 2011424272 |
Contributors: | Contribution Name Email / ID Num. Thesis advisor Samsudin, Mohd Zaki UNSPECIFIED |
Subjects: | T Technology > TA Engineering. Civil engineering > Earthwork. Foundations T Technology > TA Engineering. Civil engineering > Earthwork. Foundations > Hydraulic filling T Technology > TA Engineering. Civil engineering > Earthwork. Foundations > Foundations T Technology > TA Engineering. Civil engineering > Earthwork. Foundations > Foundations > Piles and pile-driving |
Divisions: | Universiti Teknologi MARA, Perak > Seri Iskandar Campus > Faculty of Architecture, Planning and Surveying |
Programme: | Diploma in Building Surveying |
Keywords: | Piling works, Piling, Construction Project |
Date: | 2014 |
URI: | https://ir.uitm.edu.my/id/eprint/45795 |