Abstract
Five 16-storey precast concrete domestic buildings were constructed in 1967 at 6gau Tau Kok of Hong Kong to
meet the demand for resettlement. Housing Department (HD) was established in 1973 and these blocks were under
its administration which later became Lower 6gau Tau Kok Estate (L6TK). In 2010, HD decided to demolish L6TK
for re-development. The demolition plans of the buildings were required to be submitted to the Independent Checking Unit (ICU) of HD for approval and to obtain the consent from ICU before demolition could be commenced.
Demolition of full precast concrete high rise buildings had not been carried out in Hong Kong before so vetting of
the demolition plans had to be continuously done in order to ensure the demolition work was safe. During the
process of the demolition plans, ICU and project team exchanged views on the demolition methods and site trial was arranged. The demolition plans were approved on 3/9/2010 with appropriate precautionary measures introduced. The demolition of five precast concrete domestic blocks took 9 months to complete without accident. It is therefore worthwhile to share the experiences from building control point of view on the demolition of these full precast concrete buildings in Hong Kong.
Metadata
Item Type: | Conference or Workshop Item (Paper) |
---|---|
Creators: | Creators Email / ID Num. Kung, Shu-hang, Raymond UNSPECIFIED Wu, Po-tak, Alex UNSPECIFIED |
Subjects: | T Technology > TA Engineering. Civil engineering > Building materials T Technology > TA Engineering. Civil engineering > Reinforced concrete T Technology > TH Building construction > Construction equipment in building |
Divisions: | Universiti Teknologi MARA, Perak > Seri Iskandar Campus |
Event Title: | 1st International Conference on Innovation and Technology for Sustainable Built Environment 2012 (ICITSBE 2012) |
Event Dates: | 16-17 April 2012 |
Page Range: | pp. 16-22 |
Keywords: | Independent Checking Unit, Full Precast Concrete Buildings, Demolition Sequence, Approval and Consent, Trial Run of Demolition |