Items where Division is "Faculty of Architecture, Planning and Surveying" and Year is 2017

Group by: Creators | Item Type | No Grouping
Jump to: A | B | D | G | H | I | J | K | L | M | N | O | R | S | T | Y | Z
Number of items: 79.

A

The application of ACOTEC system in the industrialised building system: the case study of medium cost apartment in Sungai Nibong, Pulau Pinang / Ahmad Mu’az Ahmad. (2017) [Student Project]

Construction of retaining wall for Residential at Bukit Mahkota, Bangi / Muhammad Akmal Azman. (2017) [Student Project]

Waterproofing system for shop houses / Aisyah Maheerah Ahmad. (2017) [Student Project]

Construction of reinforced concrete slab / Aiman Ahmad Zawawi. (2017) [Student Project]

Waterproofing system at 669@Almyra Residence Bandar Putra Mahkota, Bangi, Selangor / Ahmad Fathi Azhan. (2017) [Student Project] (Unpublished)

The installation of pad foundation / Muhammad Aiman Azami. (2017) [Student Project] (Unpublished)

Reinstallation of water supply system (Service provider for low-rise building) / Alifah Abas. (2017) [Student Project]

Construction and completion of anti-climb fencing at Pusat Kecemerlangan Lembaga Getah Malaysia (LGM) Lot 481, Mukim Sungai / Siti Syahirah Ahmad Badli Sah. (2017) [Student Project] (Submitted)

Formwork report / Ahmad Nor Haffiz Abd Rahman. (2017) Industrial Training. Universiti Teknologi MARA, Perak.

Road testing work under Majlis Daerah Baling as local authorities / Norfazliana Azizan. (2017) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Super structure / Sufian Ashari. (2017) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Centralized air conditioning system at Laman PKNS / Ahmad Syahmi Ab Hamid. (2017) [Student Project]

Construction of interlocking brick system for single storey bungalow house / Awal Hasrizwan Awaluddin. (2017) [Student Project]

Drainage Management System / Syahir Nabil Abdullah. (2017) Industrial Training. Universiti Teknologi Mara, Perak, 2017. (Unpublished)

Maintenance management in Hospital Teluk Intan / Nurul Haziqah Aziz. (2017) [Student Project] (Unpublished)

Practical training report air conditioning system service at head office Perbadanan Putrajaya (PPJ) / Fatin Nadzirah Abd Rahim. (2017) [Student Project] (Unpublished)

Menara 2, Kompleks Kejuruteraan, UiTM Shah Alam / Afiq Haiqal Amirudin ... [et al.]. (2017) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

Servicing air conditioning Fan Coil Unit (FCU) in Room 309 at Impiana Hotel Ipoh, Perak / Nor Atikah Abd Halim. (2017) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

Dilapidation in conservation / Noor Asyikin Adnan. (2017) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak.

Construction of pile foundation for telecommunication tower / Muhamad Shazwan Nahar Adam. (2017) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak.

Mechanical transportation at Pulai Springs Resort / Nurul Hidayu Abdul Halim. (2017) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak.

Rainwater harvesting system Laman PKNS, Shah Alam Selangor / Nur A’thifah Aziz. (2017) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak.

B

Construction of reinforcement concrete for floor and slab / Syazlin Azwani Bahrim. (2017) Industrial Training. Universiti Teknologi Mara, Perak, 2017. (Unpublished)

D

Construction of tunnel form system / Muhammad Luqman Darduri. (2017) [Student Project]

G

Pre-construction and post construction dilapidation survey / Muaz Ghazali. (2017) [Student Project]

H

Projek penswastaan Lebuhraya Bertingkat Sg Besi – Ulu Klang (SUKE): infrastructure industrial area and used car / Abdul Muhaimin Husain. (2017) [Student Project]

Process of building hand over / Amirul Ammar Huzaimi. (2017) [Student Project]

Gabion wall installation at Kg Tok Kaya riverbanks / Nur Aina Lylia Husa. (2017) [Student Project] (Unpublished)

Maintenance work for air-conditioning system and cooling tower at Pantai Hospital Manjung / Muhamad Naquib Halmi. (2017) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

I

Structural steel works / Mohamad Alif Syafari Ibrahim. (2017) [Student Project]

Air-conditioning system (building services) / Muhamad Luqman Hakim Ishak. (2017) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

J

Preventive maintenance (Royal Suite & Deluxe Room in Impiana Hotel) / Syairul Ridhuan Johari Al Hadi. (2017) Industrial Training. Universiti Teknologi Mara, Perak, 2017. (Unpublished)

Installation bored pile: Pembinaan Fakulti Perubatan dan Sains Kesihatan (fpsk), Universiti Sains Islam Malaysia (usim) di Nilai, Negeri Sembilan / Siti Nor Azuren Jamat. (2017) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak.

K

Installation of waterproofing system at Putra heights / Ahmad Syahmi Kamaruzaman. (2017) [Student Project]

Building condition assessment at Klinik Kesihatan Kota Kuala Muda 08500 Kota Kuala Muda, Kedah / Ku Mohamad Amin Ku Abdu Samad. (2017) [Student Project]

Pad Foundation / Muhamad Aiman Fahmi Kamaruzaman. (2017) [Student Project] (Unpublished)

L

The process of dilapidation survey case study: Bukit Jugra, Banting / Muhammad Aiman Lokman. (2017) [Student Project] (Unpublished)

M

Staindard Operation Procedure (SOP) to appoint contractor in maintenance work / Muhammad Faizul Md Rani. (2017) [Student Project] (Unpublished)

Post-inspection work after handing over process / Muhammad Imran Naim Mohd Annuar. (2017) [Student Project] (Unpublished)

Electrical service / Muhammad Hilman Mohmad Omar. (2017) [Student Project] (Unpublished)

National traffic census / Siti Nornazira Md Hashim. (2017) [Student Project] (Unpublished)

Construction of floors slab / Muhammad Aiman Imran Mohd Tarmidzi. (2017) [Student Project] (Unpublished)

Repairing work / Nazatul Ain Md Saukeri. (2017) [Student Project]

Inspection of quality standard specifications for building works / Norismanizam Mohd Nor. (2017) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Type of maintenance work at Hospital Pusrawi / Ammar Farhan Mohd Arpi. (2017) [Student Project]

Construction of UCO solid wall / Mohamad ‘Izzuddin Mohamad Taib. (2017) [Student Project]

Construction of RC staircase for fire exit route at Petronas Research Sdn Bhd, Bangi / Muhammad Badri Maarof. (2017) [Student Project]

Maintenance of water tank at Apartment Laguna Biru / Muhammad Azwan Mohtar. (2017) [Student Project]

The process of ground floor slab construction for funeral home at Masjid Ismail Petra, 17500 Tanah Merah, Kelantan / Anis Syafika Mohd Saupi. (2017) [Student Project]

The installation of air conditioning for biosecurity lab / Siti Nazurah Mustaffakamal. (2017) Industrial Training. Universiti Teknologi Mara, Perak, 2017. (Unpublished)

Supervision work at site (Recreational area in UiTM Seri Iskandar, Perak Darul Ridzuan) / Muhamad Daniesy Zamri. (2017) Industrial Training. Universiti Teknologi Mara, Perak, 2017. (Unpublished)

The installation of door and window / Muhamad Haikal Muhamad Zaidi. (2017) Industrial Training. Universiti Teknologi Mara, Perak, 2017.

Construction of superstructure at D’Bali Harmoni, Tok Bali, Pasir Puteh, Kelantan / Muhamad Ammar Zulhusni Muhamad Nawawi. (2017) [Student Project] (Unpublished)

Approval of work / Muhammad Ariff Imran Ruzlan. (2017) [Student Project] (Unpublished)

Menara Tabung Haji Ipoh / Nicholas Egat Menari... [et al.]. (2017) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak.

Contract and tendering process / Nor Emyzan Mohd Yusak. (2017) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

Piling Work Police District Headquarters, Pasir Mas, Kelantan / Muhammad Azri Che Wil. (2017) [Student Project]

Standard operating procedure (SOP) of building dilapidation survey / Muhammad Syafiq Mohd Kamil. (2017) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

Project monitoring for construct Penampang State Court / Nia Ellya Mohd Yusop. (2017) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

N

Building condition assessment for community Hall of PR1MA Residensi Taman Kamunting Aman / Noor Nazliatul Natasha Nor Azmi. (2017) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

O

Menara Celcom, Kuala Lumpur / Muhammad Lutfil Hadi Osman ... [et al.]. (2017) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

R

Waterproofing process of swimming pool / Norhafizah Rahmat. (2017) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Door construction for commercial building / Nur Shafiqah Rosli. (2017) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

S

Building condition assessment at Kuarters JKR Kuala Krai, Kelantan / Amirul Hilmi Saidi. (2017) [Student Project]

Space management of academic building (Politeknik Shah Alam) / Muhammad Shahreel Amizi Shamsuddin. (2017) [Student Project] (Unpublished)

Problem submission of the temporary permit (A case study at Pinang Tunggal) / Suhaiza Sairi. (2017) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

Payment in construction / Sharifah Natasha Iman Syed Mokhtar. (2017) Industrial Training. Universiti Teknologi Mara, Perak, 2017. (Unpublished)

Brickwall construction of Mahsan Height, Bahau Negeri Sembilan / Nurul Farhana Seeron. (2017) [Student Project] (Unpublished)

T

The construction of non-suspended ground slab on semi-d twin house / Tuan Afifudin Tuan Sulaiman. (2017) [Student Project] (Unpublished)

Method of constructing pre-cast concrete wall / Tengku Noor Fatin Tengku Zainuddin. (2017) Industrial Training. Universiti Teknologi Mara, Perak, 2017.

Y

The Regency Hotel Alor Setar / Ikmal Hakimi Yusoff... [et al.]. (2017) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak.

Z

Maintenance works in Renaissance Hotel Johor Bahru / Muhammad Akmal Zulkifle. (2017) [Student Project]

Majlis Bandaraya Ipoh, Perak / Mohd Rozimi Zakaria ... [et al.]. (2017) [Student Project]

Management and maintenance of mechanical transportation system at Sungai Buloh Hospital / Ainol Iqmal Zainal Abidin. (2017) [Student Project]

Building works and appraisals / Muhamad Azham Zakaria. (2017) [Student Project] (Unpublished)

Industrialized building system (IBS) : project proposed construction and completion two-levels building of Jabatan Audit Negara for Terengganu / Mohd Zazmir Ikhzal Zamri. (2017) [Student Project] (Unpublished)

Construction of pile foundation for telecommunication tower / Muhammad Amzarfahmi Zubidi. (2017) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

Job Hazard Analysis for upgrading Jalan Abu Bakar – Jalan Skudai, Johor Bahru, Johor Darul Takzim / Nurain Shafiqah Zainal. (2017) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak.

Conservation works of heritage building / Nurul Syazwani Zainudin. (2017) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak.

This list was generated on Sat Dec 21 23:36:59 2024 UTC.