Items where Division is "Faculty of Architecture, Planning and Surveying" and Year is 2017
A
The application of ACOTEC system in the industrialised building system: the case study of medium cost apartment in Sungai Nibong, Pulau Pinang / Ahmad Mu’az Ahmad. (2017) [Student Project]
Construction of retaining wall for Residential at Bukit Mahkota, Bangi / Muhammad Akmal Azman. (2017) [Student Project]
Waterproofing system for shop houses / Aisyah Maheerah Ahmad. (2017) [Student Project]
Construction of reinforced concrete slab / Aiman Ahmad Zawawi. (2017) [Student Project]
Waterproofing system at 669@Almyra Residence Bandar Putra Mahkota, Bangi, Selangor / Ahmad Fathi Azhan. (2017) [Student Project] (Unpublished)
The installation of pad foundation / Muhammad Aiman Azami. (2017) [Student Project] (Unpublished)
Reinstallation of water supply system (Service provider for low-rise building) / Alifah Abas. (2017) [Student Project]
Construction and completion of anti-climb fencing at Pusat Kecemerlangan Lembaga Getah Malaysia (LGM) Lot 481, Mukim Sungai / Siti Syahirah Ahmad Badli Sah. (2017) [Student Project] (Submitted)
Formwork report / Ahmad Nor Haffiz Abd Rahman. (2017) Industrial Training. Universiti Teknologi MARA, Perak.
Road testing work under Majlis Daerah Baling as local authorities / Norfazliana Azizan. (2017) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Super structure / Sufian Ashari. (2017) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Centralized air conditioning system at Laman PKNS / Ahmad Syahmi Ab Hamid. (2017) [Student Project]
Construction of interlocking brick system for single storey bungalow house / Awal Hasrizwan Awaluddin. (2017) [Student Project]
Drainage Management System / Syahir Nabil Abdullah. (2017) Industrial Training. Universiti Teknologi Mara, Perak, 2017. (Unpublished)
Maintenance management in Hospital Teluk Intan / Nurul Haziqah Aziz. (2017) [Student Project] (Unpublished)
Practical training report air conditioning system service at head office Perbadanan Putrajaya (PPJ) / Fatin Nadzirah Abd Rahim. (2017) [Student Project] (Unpublished)
Menara 2, Kompleks Kejuruteraan, UiTM Shah Alam / Afiq Haiqal Amirudin ... [et al.]. (2017) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)
Servicing air conditioning Fan Coil Unit (FCU) in Room 309 at Impiana Hotel Ipoh, Perak / Nor Atikah Abd Halim. (2017) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)
Dilapidation in conservation / Noor Asyikin Adnan. (2017) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak.
Construction of pile foundation for telecommunication tower / Muhamad Shazwan Nahar Adam. (2017) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak.
Mechanical transportation at Pulai Springs Resort / Nurul Hidayu Abdul Halim. (2017) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak.
Rainwater harvesting system Laman PKNS, Shah Alam Selangor / Nur A’thifah Aziz. (2017) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak.
B
Construction of reinforcement concrete for floor and slab / Syazlin Azwani Bahrim. (2017) Industrial Training. Universiti Teknologi Mara, Perak, 2017. (Unpublished)
D
Construction of tunnel form system / Muhammad Luqman Darduri. (2017) [Student Project]
G
Pre-construction and post construction dilapidation survey / Muaz Ghazali. (2017) [Student Project]
H
Projek penswastaan Lebuhraya Bertingkat Sg Besi – Ulu Klang (SUKE): infrastructure industrial area and used car / Abdul Muhaimin Husain. (2017) [Student Project]
Process of building hand over / Amirul Ammar Huzaimi. (2017) [Student Project]
Gabion wall installation at Kg Tok Kaya riverbanks / Nur Aina Lylia Husa. (2017) [Student Project] (Unpublished)
Maintenance work for air-conditioning system and cooling tower at Pantai Hospital Manjung / Muhamad Naquib Halmi. (2017) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)
I
Structural steel works / Mohamad Alif Syafari Ibrahim. (2017) [Student Project]
Air-conditioning system (building services) / Muhamad Luqman Hakim Ishak. (2017) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)
J
Preventive maintenance (Royal Suite & Deluxe Room in Impiana Hotel) / Syairul Ridhuan Johari Al Hadi. (2017) Industrial Training. Universiti Teknologi Mara, Perak, 2017. (Unpublished)
Installation bored pile: Pembinaan Fakulti Perubatan dan Sains Kesihatan (fpsk), Universiti Sains Islam Malaysia (usim) di Nilai, Negeri Sembilan / Siti Nor Azuren Jamat. (2017) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak.
K
Installation of waterproofing system at Putra heights / Ahmad Syahmi Kamaruzaman. (2017) [Student Project]
Building condition assessment at Klinik Kesihatan Kota Kuala Muda 08500 Kota Kuala Muda, Kedah / Ku Mohamad Amin Ku Abdu Samad. (2017) [Student Project]
Pad Foundation / Muhamad Aiman Fahmi Kamaruzaman. (2017) [Student Project] (Unpublished)
L
The process of dilapidation survey case study: Bukit Jugra, Banting / Muhammad Aiman Lokman. (2017) [Student Project] (Unpublished)
M
Staindard Operation Procedure (SOP) to appoint contractor in maintenance work / Muhammad Faizul Md Rani. (2017) [Student Project] (Unpublished)
Post-inspection work after handing over process / Muhammad Imran Naim Mohd Annuar. (2017) [Student Project] (Unpublished)
Electrical service / Muhammad Hilman Mohmad Omar. (2017) [Student Project] (Unpublished)
National traffic census / Siti Nornazira Md Hashim. (2017) [Student Project] (Unpublished)
Construction of floors slab / Muhammad Aiman Imran Mohd Tarmidzi. (2017) [Student Project] (Unpublished)
Repairing work / Nazatul Ain Md Saukeri. (2017) [Student Project]
Inspection of quality standard specifications for building works / Norismanizam Mohd Nor. (2017) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Type of maintenance work at Hospital Pusrawi / Ammar Farhan Mohd Arpi. (2017) [Student Project]
Construction of UCO solid wall / Mohamad ‘Izzuddin Mohamad Taib. (2017) [Student Project]
Construction of RC staircase for fire exit route at Petronas Research Sdn Bhd, Bangi / Muhammad Badri Maarof. (2017) [Student Project]
Maintenance of water tank at Apartment Laguna Biru / Muhammad Azwan Mohtar. (2017) [Student Project]
The process of ground floor slab construction for funeral home at Masjid Ismail Petra, 17500 Tanah Merah, Kelantan / Anis Syafika Mohd Saupi. (2017) [Student Project]
The installation of air conditioning for biosecurity lab / Siti Nazurah Mustaffakamal. (2017) Industrial Training. Universiti Teknologi Mara, Perak, 2017. (Unpublished)
Supervision work at site (Recreational area in UiTM Seri Iskandar, Perak Darul Ridzuan) / Muhamad Daniesy Zamri. (2017) Industrial Training. Universiti Teknologi Mara, Perak, 2017. (Unpublished)
The installation of door and window / Muhamad Haikal Muhamad Zaidi. (2017) Industrial Training. Universiti Teknologi Mara, Perak, 2017.
Construction of superstructure at D’Bali Harmoni, Tok Bali, Pasir Puteh, Kelantan / Muhamad Ammar Zulhusni Muhamad Nawawi. (2017) [Student Project] (Unpublished)
Approval of work / Muhammad Ariff Imran Ruzlan. (2017) [Student Project] (Unpublished)
Menara Tabung Haji Ipoh / Nicholas Egat Menari... [et al.]. (2017) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak.
Contract and tendering process / Nor Emyzan Mohd Yusak. (2017) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)
Piling Work Police District Headquarters, Pasir Mas, Kelantan / Muhammad Azri Che Wil. (2017) [Student Project]
Standard operating procedure (SOP) of building dilapidation survey / Muhammad Syafiq Mohd Kamil. (2017) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)
Project monitoring for construct Penampang State Court / Nia Ellya Mohd Yusop. (2017) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)
N
Building condition assessment for community Hall of PR1MA Residensi Taman Kamunting Aman / Noor Nazliatul Natasha Nor Azmi. (2017) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)
O
Menara Celcom, Kuala Lumpur / Muhammad Lutfil Hadi Osman ... [et al.]. (2017) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)
R
Waterproofing process of swimming pool / Norhafizah Rahmat. (2017) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Door construction for commercial building / Nur Shafiqah Rosli. (2017) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)
S
Building condition assessment at Kuarters JKR Kuala Krai, Kelantan / Amirul Hilmi Saidi. (2017) [Student Project]
Space management of academic building (Politeknik Shah Alam) / Muhammad Shahreel Amizi Shamsuddin. (2017) [Student Project] (Unpublished)
Problem submission of the temporary permit (A case study at Pinang Tunggal) / Suhaiza Sairi. (2017) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)
Payment in construction / Sharifah Natasha Iman Syed Mokhtar. (2017) Industrial Training. Universiti Teknologi Mara, Perak, 2017. (Unpublished)
Brickwall construction of Mahsan Height, Bahau Negeri Sembilan / Nurul Farhana Seeron. (2017) [Student Project] (Unpublished)
T
The construction of non-suspended ground slab on semi-d twin house / Tuan Afifudin Tuan Sulaiman. (2017) [Student Project] (Unpublished)
Method of constructing pre-cast concrete wall / Tengku Noor Fatin Tengku Zainuddin. (2017) Industrial Training. Universiti Teknologi Mara, Perak, 2017.
Y
The Regency Hotel Alor Setar / Ikmal Hakimi Yusoff... [et al.]. (2017) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak.
Z
Maintenance works in Renaissance Hotel Johor Bahru / Muhammad Akmal Zulkifle. (2017) [Student Project]
Majlis Bandaraya Ipoh, Perak / Mohd Rozimi Zakaria ... [et al.]. (2017) [Student Project]
Management and maintenance of mechanical transportation system at Sungai Buloh Hospital / Ainol Iqmal Zainal Abidin. (2017) [Student Project]
Building works and appraisals / Muhamad Azham Zakaria. (2017) [Student Project] (Unpublished)
Industrialized building system (IBS) : project proposed construction and completion two-levels building of Jabatan Audit Negara for Terengganu / Mohd Zazmir Ikhzal Zamri. (2017) [Student Project] (Unpublished)
Construction of pile foundation for telecommunication tower / Muhammad Amzarfahmi Zubidi. (2017) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)
Job Hazard Analysis for upgrading Jalan Abu Bakar – Jalan Skudai, Johor Bahru, Johor Darul Takzim / Nurain Shafiqah Zainal. (2017) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak.
Conservation works of heritage building / Nurul Syazwani Zainudin. (2017) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak.