Method installation of fencing works / Muhammad Shahrul Syazwan Bajuri

Bajuri, Muhammad Shahrul Syazwan (2019) Method installation of fencing works / Muhammad Shahrul Syazwan Bajuri. Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Abstract

The aim of this report is to obtain a comprehensive understanding on how the method of wire mesh fence installation for outdoor futsal court project was undertaken. To achieve the aim as mentioned above, there were three objectives involved such as to explain the method of the fence installation, to determine the machinery and tools needed and to identify the problem occurred as well as its solutions to solve the problem. Thus, three (3) research methods were carried out such as observation, unstructured interview and document review the findings revealed that there were eight (8) methods need to take into consideration consists of site clearance, setting up steel posts, formworks installation, poured the concrete, plastering works, installing the welded wire mesh fences, painting works as well as site cleaning.

Metadata

Item Type: Monograph (Industrial Training)
Creators:
Creators
Email / ID Num.
Bajuri, Muhammad Shahrul Syazwan
2017207042
Contributors:
Contribution
Name
Email / ID Num.
Thesis advisor
Ahmad, Suryani
UNSPECIFIED
Thesis advisor
Mahyuddin, Muhammad Naim
UNSPECIFIED
Thesis advisor
Ismail, Dzulkarnaen
UNSPECIFIED
Subjects: T Technology > TH Building construction > Details in building design and construction.Including walls, roofs
Divisions: Universiti Teknologi MARA, Perak > Seri Iskandar Campus
Universiti Teknologi MARA, Perak > Seri Iskandar Campus > Faculty of Architecture, Planning and Surveying
Keywords: method installation, fencing works, machinery and tools
Date: 2019
URI: https://ir.uitm.edu.my/id/eprint/99259
Edit Item
Edit Item

Download

[thumbnail of 99259.pdf] Text
99259.pdf

Download (9MB)

ID Number

99259

Indexing

Statistic

Statistic details