Method construction of retaining wall for onsite storm water detention pond (OSD Pond) / Izzah Nur Imanina Ahmad Safawi

Ahmad Safawi, Izzah Nur Imanina (2019) Method construction of retaining wall for onsite storm water detention pond (OSD Pond) / Izzah Nur Imanina Ahmad Safawi. Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Abstract

Retaining wall for OSD Pond is a very important component to support soil and hold the soil to improved more strengthen to the soil, therefore this report will discuss about the method of construction works OSD Pond , Type of re-bar and the installation of OSD Pond outlet pipe, this repo1ied was conducted for building construction of CADANGAN PEMBANGUNAN PERUMAHAN ATAS LOT 1107,1163,1330,30002 (DAHULUNYA LOT 3002) DAN LOT 31205 (DAHULUNYA LOT 234), MUKJM GALI, DAERAH RAUB, PAHANG DARUL MAKMUR UNTUL TETUAN WISDOM INFINITY SDN. BHD.

Metadata

Item Type: Monograph (Industrial Training)
Creators:
Creators
Email / ID Num.
Ahmad Safawi, Izzah Nur Imanina
2017213492
Contributors:
Contribution
Name
Email / ID Num.
Thesis advisor
Ismail, Sallehan
UNSPECIFIED
Thesis advisor
Mahyuddin, Muhammad Naim
UNSPECIFIED
Thesis advisor
Ismail, Dzulkarnaen
UNSPECIFIED
Subjects: T Technology > TH Building construction > Walls
Divisions: Universiti Teknologi MARA, Perak > Seri Iskandar Campus
Universiti Teknologi MARA, Perak > Seri Iskandar Campus > Faculty of Architecture, Planning and Surveying
Keywords: method, construction, retaining wall
Date: 2019
URI: https://ir.uitm.edu.my/id/eprint/97940
Edit Item
Edit Item

Download

[thumbnail of 97940.pdf] Text
97940.pdf

Download (13MB)

ID Number

97940

Indexing

Statistic

Statistic details