Retaining wall for OSD Pond is a very important component to support soil and hold the soil to improved more strengthen to the soil, therefore this report will discuss about the method of construction works OSD Pond , Type of re-bar and the installation of OSD Pond outlet pipe, this repo1ied was conducted for building construction of CADANGAN PEMBANGUNAN PERUMAHAN ATAS LOT 1107,1163,1330,30002 (DAHULUNYA LOT 3002) DAN LOT 31205 (DAHULUNYA LOT 234), MUKJM GALI, DAERAH RAUB, PAHANG DARUL MAKMUR UNTUL TETUAN WISDOM INFINITY SDN. BHD.
Metadata
Item Type: | Monograph (Industrial Training) |
---|---|
Creators: | Creators Email / ID Num. Ahmad Safawi, Izzah Nur Imanina 2017213492 |
Contributors: | Contribution Name Email / ID Num. Thesis advisor Ismail, Sallehan UNSPECIFIED Thesis advisor Mahyuddin, Muhammad Naim UNSPECIFIED Thesis advisor Ismail, Dzulkarnaen UNSPECIFIED |
Subjects: | T Technology > TH Building construction > Walls |
Divisions: | Universiti Teknologi MARA, Perak > Seri Iskandar Campus Universiti Teknologi MARA, Perak > Seri Iskandar Campus > Faculty of Architecture, Planning and Surveying |
Keywords: | method, construction, retaining wall |
Date: | 2019 |
URI: | https://ir.uitm.edu.my/id/eprint/97940 |