Abstract
Brick wall is very important element that used to defines an area or enclose to provides security, shelter, or soundproofing. This case study was focus more on the brick wall installation at Elmina Valley 5. Purpose of this report is to know and collect knowledge about the method and sequence of how to construct a brick wall, tools and machinery of the construction. During the installation process, few problems that can be observed, for example, the credibility of the workers and the supplier issue which has delayed the project. This problem must be solved immediately to avoid the delay of the project. Company can send their workers to training and make sure the supplier can send material or equipment and machineries at the time. This solution can make a project running smoothly and perfectly. It is because, any delayed project will affect the cost of the project and the contractor will be responsibility. A wall is very importance element to the construction industry because of its function and purpose to provides security, shelter, or even soundproofing to the occupants.
Metadata
Item Type: | Monograph (Industrial Training) |
---|---|
Creators: | Creators Email / ID Num. Abdullah, Aqilah 2017206614 |
Contributors: | Contribution Name Email / ID Num. Thesis advisor Husin, Azamuddin UNSPECIFIED Thesis advisor Mahyuddin, Muhammad Naim UNSPECIFIED Thesis advisor Ismail, Dzulkarnaen UNSPECIFIED |
Subjects: | T Technology > TH Building construction > Walls |
Divisions: | Universiti Teknologi MARA, Perak > Seri Iskandar Campus Universiti Teknologi MARA, Perak > Seri Iskandar Campus > Faculty of Architecture, Planning and Surveying |
Keywords: | brickwall, installation, machinery |
Date: | 2019 |
URI: | https://ir.uitm.edu.my/id/eprint/97422 |