Abstract
Construction manpower planning is crucial to be organized on certain site as it determines the condition and smoothness of the project. For the successful completion of a project, there is a need for perfect manpower planning. To utilize the power and dedication of the construction workers, the best manpower planning strategy shall be followed. Therefore, the aim of this report is to explain the procedures involves in managing manpower on construction site and the problems that may occur during managing manpower. To complete this report, the inspection was done on construction site along with pictures taken to observe how are the workers were managed on the site with important information gathered from the interview with people involved.
Metadata
Item Type: | Monograph (Industrial Training) |
---|---|
Creators: | Creators Email / ID Num. Che Yusoff, Wan Muhammad Husainuddin 2019213202 |
Contributors: | Contribution Name Email / ID Num. Thesis advisor Hadzaman, Nor Asma Hafizah UNSPECIFIED Thesis advisor Ismail, Dzulkarnaen UNSPECIFIED |
Subjects: | H Social Sciences > HD Industries. Land use. Labor > Construction industry T Technology > TH Building construction |
Divisions: | Universiti Teknologi MARA, Perak > Seri Iskandar Campus Universiti Teknologi MARA, Perak > Seri Iskandar Campus > Faculty of Architecture, Planning and Surveying |
Keywords: | Construction site |
Date: | 2021 |
URI: | https://ir.uitm.edu.my/id/eprint/93749 |