Abstract
The construction industry in Malaysia is experiencing a migration from conventional methods to a more systematic and mechanised method known as the Industrialised Building System (IBS). Each state in Malaysia is currently examining the developments of the IBS and its potential to overcome the shortages of housing accommodations in this country. This report was conducted for the building construction of a single storey house and installation of IBS precast panel system at Kg. Che Zainal Tambahan 1, Chemor, Perak Darul Ridzuan. The prime objective of building construction is to make sure that the performance of the Industrialised Building System (IBS) can be continues to the utmost throughout its construction field. The objectives of this report is to investigate the methods of IBS construction for PPRT houses, to identify the details equipment and jointing of building elements, and to identify the problems occurred during the construction works. The method of study used is by observation, interview, and document reviews to gain much knowledge in making this report. This report will state the overall installation method of IBS precast panel system and type of jointing elements used in this project which is a good quality and a good management system that will able to give a better impact for the buildings in the future.
Metadata
Item Type: | Monograph (Industrial Training) |
---|---|
Creators: | Creators Email / ID Num. Syed Razali, Sharifah Nurin Afiqah 2019233992 |
Contributors: | Contribution Name Email / ID Num. Thesis advisor Hadzaman, Nor Asma Hafizah UNSPECIFIED Thesis advisor Ismail, Dzulkarnaen UNSPECIFIED |
Subjects: | T Technology > TE Highway engineering. Roads and pavements > Construction details. Including foundations, maintenance, equipment T Technology > TH Building construction T Technology > TH Building construction > Contractors T Technology > TH Building construction > House construction |
Divisions: | Universiti Teknologi MARA, Perak > Seri Iskandar Campus Universiti Teknologi MARA, Perak > Seri Iskandar Campus > Faculty of Architecture, Planning and Surveying |
Keywords: | Construction, Perumahan Rakyat Termiskin (PPRT) |
Date: | 2022 |
URI: | https://ir.uitm.edu.my/id/eprint/93446 |