Selection of sub-contractor for specialist work (rc piles installation works) / Muhammad Amirul Aiman Nor Azam

Nor Azam, Muhammad Amirul Aiman (2022) Selection of sub-contractor for specialist work (rc piles installation works) / Muhammad Amirul Aiman Nor Azam. Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Abstract

Choosing a subcontractor for specialised work on a construction project is a difficult decision for the main contractor to make because it can affect the progression and smoothness of the project’s delivery. An improper subcontractor’s selection can result in issues such as poor work quality and project’s cost and time overrun. Thus, this report aims to study the selection of subcontractors for specialist works specifically for the installation works of reinforced concrete piles at the E’Island Lake Haven Residence project. It comprises four blocks, an 18-storey high rise residential project that is currently under construction in Puchong, Selangor. The three objectives for this report are to investigate the methods of subcontractor selection for specialized construction related works together with its significance, to analyse the criteria for subcontractor selections that make them qualified for the works, and lastly is to determine the problems that could arise during subcontractor selection and the ways to overcome them. This report will mainly focus on the responsibilities of the contracts department of the main contractor and what are their roles in selecting the best subcontractor to put responsible for the mentioned scope of works at a construction site.

Metadata

Item Type: Monograph (Industrial Training)
Creators:
Creators
Email / ID Num.
Nor Azam, Muhammad Amirul Aiman
2019227846
Contributors:
Contribution
Name
Email / ID Num.
Thesis advisor
Raja Nhari, Raja Nurulhaiza
UNSPECIFIED
Thesis advisor
Hadzaman, Nor Asma Hafizah
UNSPECIFIED
Thesis advisor
Ismail, Dzulkarnaen
UNSPECIFIED
Subjects: T Technology > TH Building construction > Contractors
Divisions: Universiti Teknologi MARA, Perak > Seri Iskandar Campus > Faculty of Architecture, Planning and Surveying
Keywords: selection of sub-contractor, rc piles, installation works
Date: 2022
URI: https://ir.uitm.edu.my/id/eprint/84680
Edit Item
Edit Item

Download

[thumbnail of 84680.PDF] Text
84680.PDF

Download (2MB)

ID Number

84680

Indexing

Statistic

Statistic details