Construction process of TNB compact substation / Muhammad Aiman Zikri Md Jizat

Md Jizat, Muhammad Aiman Zikri (2022) Construction process of TNB compact substation / Muhammad Aiman Zikri Md Jizat. Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Abstract

Compact substations are used for energy transformation in secondary distribution network from MV to LV or LV to MV. This report is briefly explained about construction process of TNB Compact substations. From the observation, writer gets to know how the basic of construction is done for becoming a building TNB compact substation and it is also the basic to make the building. In construction, the differences of another construction are based on plan architectural. The objective of this study is to identify the construction process of TNB compact substation. The method of this study is by using observation, interview and document review. For the conclusion, this report can explain with clearly how the process built up for TNB substation done starting from site to completion.

Metadata

Item Type: Monograph (Industrial Training)
Creators:
Creators
Email / ID Num.
Md Jizat, Muhammad Aiman Zikri
2019210574
Contributors:
Contribution
Name
Email / ID Num.
Thesis advisor
Abd Rashid, Mohd Najib
UNSPECIFIED
Thesis advisor
Hadzaman, Nor Asma Hafizah
UNSPECIFIED
Thesis advisor
Ismail, Dzulkarnaen
UNSPECIFIED
Subjects: T Technology > TH Building construction > Buildings: Construction with reference to use.Including public buildings, dwellings
Divisions: Universiti Teknologi MARA, Perak > Seri Iskandar Campus > Faculty of Architecture, Planning and Surveying
Keywords: Construction process, Tenaga Nasional Berhad (TNB)
Date: 2022
URI: https://ir.uitm.edu.my/id/eprint/84175
Edit Item
Edit Item

Download

[thumbnail of 84175.PDF] Text
84175.PDF

Download (2MB)

ID Number

84175

Indexing

Statistic

Statistic details