Abstract
Building is a very important thing where it can meet some of the needs of society for example its main functions include providing protection from the elements, security, living space, privacy, storing commodities, and allowing people to live and work comfortably. therefore, this report will discuss on how to prepare work documents by direct appointment as well as the correct format in the preparation of work documents based on contractor documents for the completed project and also my involvement in the process of preparing work procurement documents by direct appointment for work - drainage system maintenance work at PWD Kulai district as well as other - other related work. The goal of this study is to show you how to efficiently generate work papers such as quotations and work procurement documents via direct appointment. It will concentrate on becoming skilled at identifying the best construction method to use. and concentrate on being able to create technical drawings that are both accurate and easy to understand. This report will also look at how the process to produce BQ and build up rate for upgrade works and its importance based on the Civil Engineering and Building Work Rate Schedule Year 2021 issued by the Ministry of Works Malaysia (KKR).
Metadata
Item Type: | Monograph (Industrial Training) |
---|---|
Creators: | Creators Email / ID Num. Mohd Kamal, Muhamad Fareez Syahmi 2019448374 |
Contributors: | Contribution Name Email / ID Num. Thesis advisor Husin, Azamuddin UNSPECIFIED Thesis advisor Hadzaman, Nor Asma Hafizah UNSPECIFIED Thesis advisor Ismail, Dzulkarnaen UNSPECIFIED |
Subjects: | T Technology > TH Building construction > Contractors |
Divisions: | Universiti Teknologi MARA, Perak > Seri Iskandar Campus > Faculty of Architecture, Planning and Surveying |
Keywords: | building upgrading works, work documents, contractor |
Date: | 2021 |
URI: | https://ir.uitm.edu.my/id/eprint/83974 |