Suhaimi, Muhamad Izzat
(2021)
Tower footing stabilizer works / Muhamad 'Izzat Suhaimi.
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Abstract
Soil nailing is a construction technique that allows for the safe over-steepening of new or existing soil slopes as a restorative solution to address unstable natural soil slopes. This report was conducted for the soil treatment at Tower 150 & 155 TNB cable 275Kv TPAH-UJLI. The objective of this report is to tell about soil nailing and how far soil nailing can safe every TNB`s tower from falling down.
Metadata
Item Type: | Monograph (Industrial Training) |
---|---|
Creators: | Creators Email / ID Num. Suhaimi, Muhamad Izzat 2019435962 |
Contributors: | Contribution Name Email / ID Num. Thesis advisor Kamal, Kamarul Syahril UNSPECIFIED Thesis advisor Hadzaman, Nor Asma Hafizah UNSPECIFIED Thesis advisor Ismail, Zulkarnaen UNSPECIFIED |
Subjects: | T Technology > TH Building construction > Buildings: Construction with reference to use.Including public buildings, dwellings |
Divisions: | Universiti Teknologi MARA, Perak > Seri Iskandar Campus > Faculty of Architecture, Planning and Surveying |
Keywords: | construction technique, tower footing stabilizer works, soil nailing |
Date: | 2021 |
URI: | https://ir.uitm.edu.my/id/eprint/83973 |