Abstract
The world is moving toward digitalization era. In view of this, government from different regions are endeavour to embark on this shift by integrating digitalization strategies in the policy making. However, the implication of implementing Industrial Revolution 4.0 (IR 4.0) in construction projects is not fully explored. As such, the objectives of this study were to identify the critical barriers and impacts of the implementation of IR 4.0 in construction projects. In view of time and funding constraints, this study was limited in the Malaysia region. Questionnaire was designed to gauge the opinions of construction stakeholders on the implementation of IR 4.0 in construction projects. It was found that the most critical barriers were 'additional time is required', 'lack of technical and knowledgeable staff, 'lack of financial resources' and 'lack of manpower'. The critical positive impact of IR 4.0 implementation in construction projects were 'safety', 'project success' and 'time performance'. This study provides information to the relevant stakeholders to propose more practical strategies to assist construction stakeholders to embark on IR 4.0 in construction projects.
Metadata
Item Type: | Conference or Workshop Item (Paper) |
---|---|
Creators: | Creators Email / ID Num. Wee Zhen Zhi, Nicole UNSPECIFIED Wai Wah, Low UNSPECIFIED Shi Yee, Wong UNSPECIFIED Kwong Soon, Wong UNSPECIFIED |
Subjects: | T Technology > TH Building construction > Construction by phase of the work (Building trades) |
Divisions: | Universiti Teknologi MARA, Perak > Seri Iskandar Campus > Faculty of Architecture, Planning and Surveying |
Journal or Publication Title: | Property Talk 2021: Industrial Revolution 4.0 in Malaysia Property |
Event Title: | Property Talk 2021: Industrial Revolution 4.0 in Malaysia Property |
Event Dates: | November |
Page Range: | pp. 56-60 |
Keywords: | Barriers, construction projects, impacts, Industrial Revolution 4.0 |
Date: | 2021 |
URI: | https://ir.uitm.edu.my/id/eprint/81507 |