Abstract
Handover is a very important element to elaborate, therefore this report will discuss about project handing over for the building. This report was conducted for the building hostel Lembaga Tabung Angkatan Tentera (LTA T) at UIA, Gombak. The objective of this report is to know what, and how it is project hand over. It will focus on, this three segments which are before, during, and after for these project hand over. To illustrate the function of project hand over of building as an important aspect to focus on documentation and then to evaluate how far the potential of the building hand over that could fulfill the building criteria that is prescribes by the standard building requirements in the guideline. This report will also look at the project hand over management based on the guideline by producing the use of effective and to evaluate the quality to hand over project.
Metadata
Item Type: | Monograph (Industrial Training) |
---|---|
Creators: | Creators Email / ID Num. Asri Jamaludin, Mohamad Hairul 2013694264 |
Contributors: | Contribution Name Email / ID Num. Thesis advisor Husin, Azamuddin UNSPECIFIED Thesis advisor Abdullah, Mohd Rofdzi UNSPECIFIED Thesis advisor Ishak, Nor Rizallinda UNSPECIFIED |
Subjects: | T Technology > TH Building construction > Details in building design and construction.Including walls, roofs |
Divisions: | Universiti Teknologi MARA, Perak > Seri Iskandar Campus > Faculty of Architecture, Planning and Surveying |
Keywords: | project handover, proposed design, construction, completion, commissioning |
Date: | 2015 |
URI: | https://ir.uitm.edu.my/id/eprint/80196 |