Abstract
Following the procedure for installation of window is very important, hereby this report will discuss about installation of double aluminum louvers with glass naco louvers and also delivery schedule of window frame and window accessories from factory to site. This report was carried out to gain the knowledge how to install the window following the right step and also to gain knowledge how the journey of delivery schedule of window from factory to site storage. The objective of this report is to identify how to install the window that begin from establish datum floor until finish installed all window including window accessories and also to identify what should do when window frame arrived at site, what method to unload window frame. Method to gain information for this report is interview from site supervisor how conduct, by reconnaissance at site look how the workers carried out installation work. This report will also look at all the installation procedure should be followed so that requirement from client is achieve.
Metadata
Item Type: | Monograph (Industrial Training) |
---|---|
Creators: | Creators Email / ID Num. Mohd Nasir, Mohamad Arif 2013821684 |
Contributors: | Contribution Name Email / ID Num. Thesis advisor Wan Alwi, Wan Abdullah UNSPECIFIED Thesis advisor Ishak, Noor Rizallinda UNSPECIFIED Thesis advisor Abdullah, Mohd Rofdzi UNSPECIFIED |
Subjects: | T Technology > TH Building construction > Details in building design and construction.Including walls, roofs |
Divisions: | Universiti Teknologi MARA, Perak > Seri Iskandar Campus > Faculty of Architecture, Planning and Surveying |
Keywords: | installation, double aluminium louvers, glass naco louvers |
Date: | 2015 |
URI: | https://ir.uitm.edu.my/id/eprint/80190 |