Method construction of reinforcement concrete pile / Muhammad Faiz Yaacob

Yaacob, Muhammad Faiz (2013) Method construction of reinforcement concrete pile / Muhammad Faiz Yaacob. Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Abstract

A building is generally composed of a superstructure above the ground and a substructure which forms the foundation below ground level. The foundations transfer and spread the loads from a structure's columns and walls in to the ground. This report briefly describes about all the process and method involved in reinforced concrete (RC) pile work that carried on at residential area based on interview, observation, searching internet and reading book. This report prepared based on the five months working experience at the construction site. Two proposed objective been highlight is to understand the installation procedure, process, and to identify material, plant and machineries used for RC pile. This report divided by several parts which started with the company background and construction project background. Based on the experience, RC pile work is not easy as it looks in terms of its construction process. However, it is more economical and faster to construct compared to other types of pile foundation. The method of embedded RC piles is using a hydraulic piling machine. Furthermore, all the machineries, plants and equipment's that involved in RC pile construction also are study. During the RC pile work, has a small number of problem and a few suggestion that believe can overcome the problem occur stated herein. As a conclusion, this report should expose to readers in details about the process and method involved in RC pile work.

Metadata

Item Type: Monograph (Industrial Training)
Creators:
Creators
Email / ID Num.
Yaacob, Muhammad Faiz
2011615946
Contributors:
Contribution
Name
Email / ID Num.
Thesis advisor
Ishak, Nor Rizallinda
UNSPECIFIED
Thesis advisor
Abdullah, Anas Zafirol
UNSPECIFIED
Thesis advisor
Abdullah, Mohd Rofdzi
UNSPECIFIED
Subjects: T Technology > TH Building construction > Details in building design and construction.Including walls, roofs
Divisions: Universiti Teknologi MARA, Perak > Seri Iskandar Campus > Faculty of Architecture, Planning and Surveying
Programme: Diploma in Building
Keywords: method construction, reinforcement concrete pile, foundation
Date: 2013
URI: https://ir.uitm.edu.my/id/eprint/79683
Edit Item
Edit Item

Download

[thumbnail of 79683.pdf] Text
79683.pdf

Download (25MB)

ID Number

79683

Indexing

Statistic

Statistic details