Abstract
This report briefly described the methods involved before and during the quotation or tender evaluation process is being conducted, as well as the result of recommended contractor also had been mentioned in this report. It is made based on five months experience at Development and Asset Management Office, Universiti Putra Malaysia. This report is divided into few chapters which included company's background and project's background. From the observation, it is clearly shows that the tender preparation and tender evaluation is not as easy as it seems. It involves many parties and complicated procedures. This report described in more detail about the methods involved and applied starting from the preparation of the project summary until tender details and evaluation results. During tender evaluation process, few problems had occurred and this report has mentioned the way to solve it. As a conclusion, this report has provided sufficient information about tender evaluation and process involved before it besides practical method for the readers.
Metadata
Item Type: | Monograph (Industrial Training) |
---|---|
Creators: | Creators Email / ID Num. Hailani, Adlina 2011493098 |
Contributors: | Contribution Name Email / ID Num. Thesis advisor Majid, Mohd Fareh UNSPECIFIED Thesis advisor Abdullah Halim, Anas Zafirol UNSPECIFIED Thesis advisor Abdullah, Mohd Rofdzi UNSPECIFIED |
Subjects: | T Technology > TH Building construction > Contractors |
Divisions: | Universiti Teknologi MARA, Perak > Seri Iskandar Campus > Faculty of Architecture, Planning and Surveying |
Programme: | Diploma in Building |
Keywords: | methods, tender evaluation process, contractor |
Date: | 2013 |
URI: | https://ir.uitm.edu.my/id/eprint/77821 |