Construction of cast in situ bored pile / Nurhamizah Md Anuar

Md Anuar, Nurhamizah (2012) Construction of cast in situ bored pile / Nurhamizah Md Anuar. Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Abstract

This report briefly explained the work methodology of Construction of Cast In Situ Bored Pile. In this report, various important aspects involved to make it work as well as it is a fundamentally important element especially in infrastructure development. This report is completed during the practical training at the construction site of Kelana Jaya (KLJ) Railway Extension Project in Trans Resources Corporation Sdn. Bhd. for 5 months. This report has been divided into sections for ease of understanding to those who read it. This section starts from the introduction, company background, and the work methodology (practical). This study includes theoretical study of resource website, interviews with individuals who are experienced and study for 5 months. During the practical training are on site, the construction work for bored pile works is not as easy as in thought. This is because the work involves a lot of work to be done. For example, the construction work should be completed boring a hole, the borehole need to be clean and free from soil collapse. The. study results found that, the management relies heavily on the outcome of the discussions between the parties involved in the project compared with reference to the clauses contained in the contract for the work -this bored pile work. In addition, there are also have more exposure gained on the process of infrastructure work undertaken in accordance with the field that related to Diploma in Building.

Metadata

Item Type: Monograph (Industrial Training)
Creators:
Creators
Email / ID Num.
Md Anuar, Nurhamizah
2010844876
Contributors:
Contribution
Name
Email / ID Num.
Thesis advisor
Abdul Hadi, Nurul Huda
UNSPECIFIED
Thesis advisor
Yahaya, Noor Azam
UNSPECIFIED
Thesis advisor
Ahmad, Hayroman
UNSPECIFIED
Subjects: T Technology > TH Building construction > Details in building design and construction.Including walls, roofs
Divisions: Universiti Teknologi MARA, Perak > Seri Iskandar Campus > Faculty of Architecture, Planning and Surveying
Programme: Diploma in Building
Keywords: construction of cast, bored pile, cast in-situ
Date: October 2012
URI: https://ir.uitm.edu.my/id/eprint/77228
Edit Item
Edit Item

Download

[thumbnail of 77228.pdf] Text
77228.pdf

Download (35MB)

ID Number

77228

Indexing

Statistic

Statistic details