Abstract
This report briefly explained the work methodology of Construction of Cast In Situ Bored Pile. In this report, various important aspects involved to make it work as well as it is a fundamentally important element especially in infrastructure development. This report is completed during the practical training at the construction site of Kelana Jaya (KLJ) Railway Extension Project in Trans Resources Corporation Sdn. Bhd. for 5 months. This report has been divided into sections for ease of understanding to those who read it. This section starts from the introduction, company background, and the work methodology (practical). This study includes theoretical study of resource website, interviews with individuals who are experienced and study for 5 months. During the practical training are on site, the construction work for bored pile works is not as easy as in thought. This is because the work involves a lot of work to be done. For example, the construction work should be completed boring a hole, the borehole need to be clean and free from soil collapse. The. study results found that, the management relies heavily on the outcome of the discussions between the parties involved in the project compared with reference to the clauses contained in the contract for the work -this bored pile work. In addition, there are also have more exposure gained on the process of infrastructure work undertaken in accordance with the field that related to Diploma in Building.
Metadata
Item Type: | Monograph (Industrial Training) |
---|---|
Creators: | Creators Email / ID Num. Md Anuar, Nurhamizah 2010844876 |
Contributors: | Contribution Name Email / ID Num. Thesis advisor Abdul Hadi, Nurul Huda UNSPECIFIED Thesis advisor Yahaya, Noor Azam UNSPECIFIED Thesis advisor Ahmad, Hayroman UNSPECIFIED |
Subjects: | T Technology > TH Building construction > Details in building design and construction.Including walls, roofs |
Divisions: | Universiti Teknologi MARA, Perak > Seri Iskandar Campus > Faculty of Architecture, Planning and Surveying |
Programme: | Diploma in Building |
Keywords: | construction of cast, bored pile, cast in-situ |
Date: | October 2012 |