Abstract
Concrete post tensioning is without a doubt a difficult and time-consuming construction task. This post tensioning is one of the most important aspects of construction.. The point of doing post tension is because to make the building more stable and sturdy. The elements and method of works varies on site rather than that explained theoretically. This report will discuss about post tensioning work for the beam of the building. This report was conducted for the construction of Uniten Open lab facilities at Lot 30806 Jalan Wawasan, Universiti Tenaga Nasional UNITEN, Mukim Dengkil, Daerah Sepang, Selangor Darul Ehsan. The objective of this report is to analyze about the procedure of post tensioning works (prestressed beam). It also to determine the time that have been used for the construction. This report will also look at the problem and the solution in post tensioning work prestressed beam that would fill the requirement of the project.
Metadata
Item Type: | Student Project |
---|---|
Creators: | Creators Email / ID Num. Joperi, Akmal Zuhri 2019433558 |
Contributors: | Contribution Name Email / ID Num. Thesis advisor Mahyuddin, Muhammad Naim UNSPECIFIED |
Subjects: | T Technology > TH Building construction > Details in building design and construction.Including walls, roofs T Technology > TH Building construction > Management of the construction site. Superintendence of building construction |
Divisions: | Universiti Teknologi MARA, Perak > Seri Iskandar Campus > Faculty of Architecture, Planning and Surveying |
Programme: | Diploma in Building Surveying |
Keywords: | Procedure, post-tensioning work, prestressed beam |
Date: | 2021 |
URI: | https://ir.uitm.edu.my/id/eprint/72827 |
Download
72827.pdf
Download (201kB)