Shahidan, Faiezah
(2009)
Improvement of the quality inspection process flow at production and planning control packaging line at Autokeen Sdn Bhd / Faiezah Shahidan.
[Student Project]
Abstract
A feasibility study on analyzing the data and improvement of the quality inspection process flow at packaging area at Autokeen Sdn Bhd has been done. The study has been conducted by analyzing the data by categorizing the critical and non critical rejection parts. In the existing condition, the analyzed data and improvement have been focusing at lower rejection parts which are below than two percent of total rejection parts which can be considered less important. By cutting down on quality inspection process for unnecessary parts with lower rejection, it can reduce cost and cycle time. Recommendation has been proposed to the company by designing special packing device to reduce quality checking process.
Metadata
Item Type: | Student Project |
---|---|
Creators: | Creators Email / ID Num. Shahidan, Faiezah 2006130877 |
Contributors: | Contribution Name Email / ID Num. Thesis advisor Ismail, Profesor Madya Dr Azianti 205106 |
Subjects: | T Technology > TS Manufactures > Production management. Operations management > Control of production systems > Quality control. Standards T Technology > TS Manufactures > Production management. Operations management > Control of production systems > Waste control |
Divisions: | Universiti Teknologi MARA, Johor > Pasir Gudang Campus > Faculty of Mechanical Engineering |
Programme: | Bachelor of Engineering (Hons) (Mechanical) |
Keywords: | Process flow, Quality control, Cost effective |
Date: | 2009 |
URI: | https://ir.uitm.edu.my/id/eprint/61087 |
Download
Text
61087.pdf
Download (157kB)
61087.pdf
Download (157kB)
Digital Copy
Digital (fulltext) is available at:
Physical Copy
Physical status and holdings:
Item Status:
On Shelf