Abstract
This report briefly described the application of the formwork for slab and column, machinery and tools used produced after four month experience in construction site. The objective of this report is to identify the formwork system and materials used in site. The finding from this report is the application of formwork for slab is start from installation of the table form as workplace and formwork of slab, application of mould oil, installation of reinforcement bar and M&E services component on the slab formwork, inspection of the formwork and finally casting process. For the application of formwork for column is start from installation of rebar and setting out, inspection of the rebar, application of mould oil on internal surface of formwork, installation of formwork, inspection of vertically for formwork, and finally casting and dismantling of formwork. The machinery and tools used for application of formwork is tower crane, poker vibrator, Doka trolley, Dokamatic tables and theodolite. Hope that this report can give a lot of advantages to readers on application of formwork for high rise buildings
Metadata
Item Type: | Student Project |
---|---|
Creators: | Creators Email / ID Num. Joseph Garan, Benedict Sandin 2012170519 |
Contributors: | Contribution Name Email / ID Num. Thesis advisor Hashim, Siti Zubaidah UNSPECIFIED |
Subjects: | T Technology > TH Building construction T Technology > TH Building construction > Details in building design and construction.Including walls, roofs T Technology > TH Building construction > Construction equipment in building |
Divisions: | Universiti Teknologi MARA, Perak > Seri Iskandar Campus > Faculty of Architecture, Planning and Surveying |
Programme: | Diploma in Building Surveying |
Keywords: | Construction site; System; Materials; Formwork; Slab; Column; Machinery; Tools |
Date: | 2015 |