Faktor-faktor kelewatan penyiapan projek oleh kontraktor kelas A di Kuching, Sarawak / Siti Nur Aishah Mohd Noor … [et al.]

Mohd Noor, Siti Nur Aishah and Hasbullah, Mohd Amran (2010) Faktor-faktor kelewatan penyiapan projek oleh kontraktor kelas A di Kuching, Sarawak / Siti Nur Aishah Mohd Noor … [et al.]. [Research Reports] (Unpublished)

Abstract

The Construction industry is one of the important sectors that contribute to Malaysia's economic growth and provides a lot of opportunities to every contractor to prosper which involved in this sector. On the other hand, contractors who do not appreciate this opportunity will only caused problems in terms of extended project duration, increase in cost and low quality workmanship. This study found out that the construction delays is the most significant problems and it is keep continuing. This is due to the fact that the contractors do not have the capacity of technical know-how, lack of experience and project management skills in the related project. The main purpose of this study is to identify the factors that contribute to constructional delay projects in Kuching, Sarawak

Metadata

Item Type: Research Reports
Creators:
Creators
Email / ID Num.
Mohd Noor, Siti Nur Aishah
UNSPECIFIED
Hasbullah, Mohd Amran
UNSPECIFIED
Subjects: H Social Sciences > HD Industries. Land use. Labor
H Social Sciences > H Social Sciences (General) > Research
T Technology > TH Building construction > Contractors
Divisions: Universiti Teknologi MARA, Sarawak > Research Management Institute (RMI)
Keywords: kelewatan penyiapan projek , kontraktor kelas A, di Kuching, Sarawak
Date: January 2010
URI: https://ir.uitm.edu.my/id/eprint/46108
Edit Item
Edit Item

Download

[thumbnail of 46108.pdf] Text
46108.pdf

Download (1MB)

Digital Copy

Digital (fulltext) is available at:

Physical Copy

Physical status and holdings:
Item Status:
On Shelf

ID Number

46108

Indexing

Statistic

Statistic details