Abstract
The main objective of this research is to study about building plan approval procedure for extension or renovation work. This research focused on three different local authorities approach where are Kuala Lumpur City Hall (DBKL), Shah Alam City Council (MBSA) and Subang Jaya Municipal Council (MPSJ). An observation method and desktop study are used to understand the procedure building plan process for extension or renovation work. The case study involves on local authority which are DBKL, MBSA and MPSJ. The researcher have figure out a detail procedure and process from the application stage till the issuance of Letter of Permission. The set of questionnaires were distributed to occupant in term of to fulfill the second objective which is “7o recognize understanding o f occupant toward on procedure o f extension or renovation work”. While the interviews were set up with local authority to compare the step is taken to solve an illegal work exactly in extension or renovation work as fulfill of third objective.
Metadata
Item Type: | Thesis (Degree) |
---|---|
Creators: | Creators Email / ID Num. Mohd Isa, Ahmad Faisal 2006136285 |
Contributors: | Contribution Name Email / ID Num. Advisor Khalid, Ellemy Iskandar UNSPECIFIED |
Subjects: | T Technology > TH Building construction > Maintenance and repair T Technology > TH Building construction > Buildings: Construction with reference to use.Including public buildings, dwellings |
Divisions: | Universiti Teknologi MARA, Shah Alam > Faculty of Architecture, Planning and Surveying |
Programme: | Bachelor of Building Surveying (Hons) |
Keywords: | Building plan, renovation work, approval procedure |
Date: | 2008 |
URI: | https://ir.uitm.edu.my/id/eprint/25200 |
Download
25200.pdf
Download (282kB)