Abstract
The submission approval document is very important for each construction site in order to ensure the quality and the safety of the building or the project. The aim of this study was to discover the method of submission approval at WCT management office located at Kuchai Lama, Kuala Lumpur. An appropriate case study, all information and data were collected from the observation, interview and review related documents. Submission approval was carried out by material engineer, architect and sub-contractor because it was a requirement from the client which is MRT Corporation. All the submission and data were then uploaded in the Aconex System for long term access. The submission approval at WCT management office was crucial to prevent collapse of the building and to avoid building defect.
Metadata
| Item Type: | Monograph (Industrial Training) |
|---|---|
| Creators: | Creators Email / ID Num. Nasir, Izzat Izzuddin 2017213518 |
| Contributors: | Contribution Name Email / ID Num. Thesis advisor Mohd Latif, Hafizah UNSPECIFIED Thesis advisor Mahyuddin, Muhammad Naim UNSPECIFIED Thesis advisor Ismail, Dzulkarnaen UNSPECIFIED |
| Subjects: | T Technology > TH Building construction > Contractors T Technology > TH Building construction > Management of the construction site. Superintendence of building construction |
| Divisions: | Universiti Teknologi MARA, Perak > Seri Iskandar Campus > Faculty of Architecture, Planning and Surveying |
| Keywords: | Architect, Submission, Project approval |
| Date: | 2019 |
| URI: | https://ir.uitm.edu.my/id/eprint/120855 |