Housing industry development in Malaysia / Norzihan Molan

Molan, Norzihan (1988) Housing industry development in Malaysia / Norzihan Molan. Advanced Diploma thesis, UNSPECIFIED.

Abstract

The study will emphasise on matters that cause the delay ingetting the approvals, which normally take two to five years of processing time. Thus, the delay affects large sum of money which has to be borne by developers and builders.

Edit Item
Edit Item

Download

[thumbnail of 10447.pdf] Text
10447.pdf

Download (351kB)

Digital Copy

Digital (fulltext) is available at:

Physical Copy

Physical status and holdings:
Item Status:

ID Number

10447

Indexing

Statistic

Statistic details