Items where Subject is "Slabs"
A
Construction of reinforced concrete floor slab / Nur Anis A. Rahman. (2014) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)
Concreting works for structure (slab, column, beam) for proposed 14 units double storey semi-detached houses and 236 units double storey terrace houses on parent Lot 4044, Block 18, Salak Land District, at Jalan Bako (Sourabaya), Kuching Sarawak / Lukhman Arip. (2014) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)
B
Construction of reinforcement concrete for floor and slab / Syazlin Azwani Bahrim. (2017) Industrial Training. Universiti Teknologi Mara, Perak, 2017. (Unpublished)
C
IBS installation use “stell mould forwork and pre-cast beam and half slab” / Muhamad Azmi Che Anuar. (2014) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)
K
Concrete structure for slab construction / Abdul Jalil Kasim. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak.
R
The construction of post-tensioning slab for high rise buildings / Liyana Rosli. (2016) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak.