Estimating for roadworks using lotus 1-2-3 / Dzulkifli Mohamad

Mohamad, Dzulkifli (1990) Estimating for roadworks using lotus 1-2-3 / Dzulkifli Mohamad. [Student Project] (Unpublished)

Abstract

There is no business skill of more importance to construction industry than estimating. Accurate estimates are necessary to the project owner, to the design team, and to construction team. Computer has long been recognised as having great potential in the area of construction estimating. This project has a major objective to aid the reader in both the principle of roadworks estimating and its computer application using LOTUS 1-2-3 version 2.01.

Metadata

Item Type: Student Project
Creators:
Creators
Email / ID Num.
Mohamad, Dzulkifli
UNSPECIFIED
Contributors:
Contribution
Name
Email / ID Num.
Advisor
Aboobucker, C.M.Mohamed
UNSPECIFIED
Subjects: T Technology > TA Engineering. Civil engineering > Materials of engineering and construction
Divisions: Universiti Teknologi MARA, Shah Alam > Faculty of Civil Engineering
Programme: Advanced Diploma in Civil Engineering
Keywords: Roadworks, construction
Date: 1990
URI: https://ir.uitm.edu.my/id/eprint/99828
Edit Item
Edit Item

Download

[thumbnail of 99828.pdf] Text
99828.pdf

Download (86kB)

Digital Copy

Digital (fulltext) is available at:

Physical Copy

Physical status and holdings:
Item Status:

ID Number

99828

Indexing

Statistic

Statistic details