The determination of productivity index in construction process / Amlan Yunus

Yunus, Amlan (1990) The determination of productivity index in construction process / Amlan Yunus. Advanced Diploma thesis, Universiti Teknologi MARA (UiTM).

Abstract

Labor productivity is defined as the input divided by the output, and is calculated for a finite time interval the following way: Labor Productivity = Manhours/Units of Work It is commonly called the unit rate. The need for a standardized approach for measuring construction task-level labor productivity has long been recognized. Furthermore it is known that before the factors affecting productivity can be studied, there needs to be a large data base containing information from many project constructed under a variety of conditions. This information must be uniformly collected from each project. The objective of this project is to describe a task level labor productivity measurement and performance evaluation system that can be used by owners, contractors, and subcontractors who presently do not have a formalized effort.

Metadata

Item Type: Thesis (Advanced Diploma)
Creators:
Creators
Email / ID Num.
Yunus, Amlan
88012948
Contributors:
Contribution
Name
Email / ID Num.
Advisor
Ismail, Arrifin
UNSPECIFIED
Subjects: H Social Sciences > HD Industries. Land use. Labor > Labor. Work. Working class
Divisions: Universiti Teknologi MARA, Shah Alam > Faculty of Civil Engineering
Programme: Advanced Diploma in Civil Engineering
Keywords: Construction, productivity, daily manhours
Date: 1990
URI: https://ir.uitm.edu.my/id/eprint/99749
Edit Item
Edit Item

Download

[thumbnail of 99749.pdf] Text
99749.pdf

Download (100kB)

Digital Copy

Digital (fulltext) is available at:

Physical Copy

Physical status and holdings:
Item Status:

ID Number

99749

Indexing

Statistic

Statistic details