Abstract
Piling is mainly known in a deep foundation category that is designed specially to transfer all type of load inside superstructure to the deepest bed of soil. Spun pile and reinforcement concrete piles are one of the common piles used and designed with numbers of methods by using many formulas. With these installations of deep foundation, there are also few methods of construction conducted. The main objective of this case study is to identify the method construction for pre-boring and installation of spun pile, investigate the relationship of pile driver analyzer with piles installed, and to identify the hazards occur during the construction. The installation and method used for this deep foundation installation is also conducted and approved with tolerance and its designed working load capacity.
Metadata
Item Type: | Monograph (Industrial Training) |
---|---|
Creators: | Creators Email / ID Num. Wan Najmi, Wan Mohd Danial 2017206562 |
Contributors: | Contribution Name Email / ID Num. Thesis advisor Othman, Mohamad Hamdan UNSPECIFIED Thesis advisor Mahyuddin, Muhammad Naim UNSPECIFIED Thesis advisor Ismail, Dzulkarnaen UNSPECIFIED |
Subjects: | T Technology > TH Building construction > Building fittings and their installation |
Divisions: | Universiti Teknologi MARA, Perak > Seri Iskandar Campus Universiti Teknologi MARA, Perak > Seri Iskandar Campus > Faculty of Architecture, Planning and Surveying |
Keywords: | construction method, pre-boring work, spun pile installation |
Date: | 2019 |
URI: | https://ir.uitm.edu.my/id/eprint/99301 |