Abstract
Deep foundation is very important structure in the building. It role is to transmit load all the way from the roof to the firm layer underground. All the load such as live load, dead load and wind load will be transfer to the substructure. Ignoring the important of deep foundation may cause more costs for the remedial works in the future. Therefore, main purpose of deep foundation is to avoid structure from collapse or settlement. The objective of this report is to study the method of construction Reinforcement Concrete Pile. It also focuses on how to rectify problems occur during piling work. All the broken piles were rectified by adding more piles around the area to make sure the piles able to transmit load from structure. To sump up, the proper process of driven piling and welding joint between two piles is important to avoid any consequences such as broken pile.
Metadata
Item Type: | Monograph (Industrial Training) |
---|---|
Creators: | Creators Email / ID Num. Ahmad Nizam, Nursyamimi Asyiqin 2017213406 |
Contributors: | Contribution Name Email / ID Num. Thesis advisor Husin, Azamuddin UNSPECIFIED Thesis advisor Mahyuddin, Muhammad Naim UNSPECIFIED Thesis advisor Ismail, Dzulkarnaen UNSPECIFIED |
Subjects: | T Technology > TH Building construction > House construction |
Divisions: | Universiti Teknologi MARA, Perak > Seri Iskandar Campus Universiti Teknologi MARA, Perak > Seri Iskandar Campus > Faculty of Architecture, Planning and Surveying |
Keywords: | construction, RC pile, double storey semi-D house |
Date: | 2019 |
URI: | https://ir.uitm.edu.my/id/eprint/98340 |