Abstract
To perform rational defect prevention, it is necessary to have knowledge about defects, their causes and associated costs. Defect is a very important factor to be taken seriously, therefore this report will discuss about defects management and how to solve it in a house unit. This report was conducted to investigate the High-rise building Unit defects for PHASE 2A, THE HAVRE BUKIT JALIL. The objective of this report is to identify the high-rise building unit defects by executing detailed inspections on all 15 units of houses at each floor. It will focus on identifying defects that clients did not aware of. To identify the method of rectification for the defects after it has been identified by using the right material and the appropriate time. This report will also look at the execution of rectifying the defects by choosing the right person to execute the works and thus by following these objectives it could minimise the amount of the defects that existed in the house unit in the future.
Metadata
Item Type: | Monograph (Industrial Training) |
---|---|
Creators: | Creators Email / ID Num. Shamsul Anuar, Muhamad Afiq Hakim 2016614386 |
Contributors: | Contribution Name Email / ID Num. Thesis advisor Talkis, Nor Azizah UNSPECIFIED Thesis advisor Mahyuddin, Muhammad Naim UNSPECIFIED Thesis advisor Ismail, Dzulkarnaen UNSPECIFIED |
Subjects: | T Technology > TH Building construction > Building failures, errors, defects, etc. |
Divisions: | Universiti Teknologi MARA, Perak > Seri Iskandar Campus Universiti Teknologi MARA, Perak > Seri Iskandar Campus > Faculty of Architecture, Planning and Surveying |
Keywords: | building defect management, high-rise building, methods |
Date: | 2018 |
URI: | https://ir.uitm.edu.my/id/eprint/97800 |