Abstract
In a building, everyone knows that the main part are the structure members, therefore this report will discuss things that related to the building structure. For example, structural work material for a strong structure, method used during the construction and etc. In the beginning of this report, there are some information about the practical training company, such as about the background, history, current location, completed project, organization flow and etc. This report was completed based on one of the projects handled by this company which at Puchong, Selangor. It is a 2-storey corner lot terrace house building that need some renovation and build. The main objectives of this report are to improve the knowledge about main parts of a building with more detail and also to find out either this project fulfil the requirements of a safe building or not. This report also will find out the factors of delay in project and what are the steps taken by the management to overcome the problems. Other than that, this report contains the basic stages in constructing the structure with some photos which were taken during the site visit from the beginning.
Metadata
Item Type: | Monograph (Industrial Training) |
---|---|
Creators: | Creators Email / ID Num. Abd Rahman, Rabiah Nashamirah 2017213304 |
Contributors: | Contribution Name Email / ID Num. Thesis advisor Ismail, Asmat UNSPECIFIED Thesis advisor Mahyuddin, Muhammad Naim UNSPECIFIED Thesis advisor Ismail, Dzulkarnaen UNSPECIFIED |
Subjects: | T Technology > TH Building construction > House construction |
Divisions: | Universiti Teknologi MARA, Perak > Seri Iskandar Campus Universiti Teknologi MARA, Perak > Seri Iskandar Campus > Faculty of Architecture, Planning and Surveying |
Keywords: | 2-storey terrace house, structure construction, factors of delay |
Date: | 2019 |
URI: | https://ir.uitm.edu.my/id/eprint/97359 |