Abstract
Piles are designed to transfer any dead or live load of superstructure to the deepest state of soil. Reinforcement concrete piles or RC piles are one of the common piles use and design by many analyses and using many formulas. But due to the uncertainties of problems such as soil behaviour, these piles need to be tested using several tests such as maintain load test to identify the strength of the pile. A case study of maintain load test of RC piles is conducted and the data and result are collected through settlement curves. The main objective of this case study is to determine the method construction for maintaining load test, time taken to complete the test and to determine the hazard occur during the test conducted. The findings show a method of test pile is constructed and been observed the load.
Metadata
Item Type: | Monograph (Industrial Training) |
---|---|
Creators: | Creators Email / ID Num. Alwi, Nur Erisha Emalin 2017208732 |
Contributors: | Contribution Name Email / ID Num. Thesis advisor Othman, Mohamad Hamdan UNSPECIFIED Thesis advisor Mahyuddin, Muhammad Naim UNSPECIFIED Thesis advisor Ismail, Dzulkarnaen UNSPECIFIED |
Subjects: | T Technology > TH Building construction > Building fittings and their installation |
Divisions: | Universiti Teknologi MARA, Perak > Seri Iskandar Campus Universiti Teknologi MARA, Perak > Seri Iskandar Campus > Faculty of Architecture, Planning and Surveying |
Keywords: | method and procedure, pile load test, construction |
Date: | 2019 |
URI: | https://ir.uitm.edu.my/id/eprint/97083 |