Abstract
Pile and pile cap are one of the most important structures in construction. The main topic discussed in this report is related to the structure that located below ground level based on project Cadangan membina dan menyiapkan Masjid Seksyen 24 Shah Alam, Selangor Darul Ehsan. This report describes the type, materials, and equipment used during construction of reinforcement concrete pile and pile cap. This report also explained the construction method of reinforcement concrete pile. It also determines the construction method of pile cap. To complete this report requires observation and interviews with related individuals. In conclusion this report contains all elements related to reinforcement concrete pile and pile cap that are according to specifications such as the method conducted type of structure used size of structure according to specifications.
Metadata
Item Type: | Monograph (Industrial Training) |
---|---|
Creators: | Creators Email / ID Num. Mohd Razip, Nur Zulaikha 2016458712 |
Contributors: | Contribution Name Email / ID Num. Thesis advisor Kamal, Kamarul Syahril UNSPECIFIED Thesis advisor Mahyuddin, Muhammad Naim UNSPECIFIED Thesis advisor Ismail, Dzulkarnaen UNSPECIFIED |
Subjects: | T Technology > TH Building construction > Building fittings and their installation |
Divisions: | Universiti Teknologi MARA, Perak > Seri Iskandar Campus Universiti Teknologi MARA, Perak > Seri Iskandar Campus > Faculty of Architecture, Planning and Surveying |
Keywords: | RC pile, pile cap construction, method |
Date: | 2018 |
URI: | https://ir.uitm.edu.my/id/eprint/97058 |