The extension of time of Kajang 2 commuter station / Siti Aisyah Afifah Zulkifli

Zulkifli, Siti Aisyah Afifah (2019) The extension of time of Kajang 2 commuter station / Siti Aisyah Afifah Zulkifli. Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Abstract

Extension of Time (EOT) is a very common thing that happens in the construction. The EOT can arise due to many factors, such as actual factor or intended factor. Therefore, this report will discuss about the process of EOT that can be claims by the contractor when the construction of the project being delay. The EOT in this report is focusing in project of 'Pajakan 60 Tahun Di Atas Tanah Rizab Keretapi Di Lot 853, Mukim Kajang, Daerah Hulu Langat, Selangor Dami Ehsan Oleh Srijang Kemajuan Sdn. Bhd. (SKSB) Bagi Tujuan Pembangunan Komersial Dan Kemudahan Tempat Letak Kereta' that construct a commuter station. This EOT had leaded a bad impact to the parties that involved in the project. The EOT will required a longer time and will raising the cost of the project to be complete.

Metadata

Item Type: Monograph (Industrial Training)
Creators:
Creators
Email / ID Num.
Zulkifli, Siti Aisyah Afifah
2017213446
Contributors:
Contribution
Name
Email / ID Num.
Thesis advisor
Ahmad, Normila
UNSPECIFIED
Thesis advisor
Mahyuddin, Muhammad Naim
UNSPECIFIED
Thesis advisor
Ismail, Dzulkarnaen
UNSPECIFIED
Subjects: T Technology > TH Building construction > Buildings: Construction with reference to use.Including public buildings, dwellings
Divisions: Universiti Teknologi MARA, Perak > Seri Iskandar Campus
Universiti Teknologi MARA, Perak > Seri Iskandar Campus > Faculty of Architecture, Planning and Surveying
Keywords: extension, time commuter station, construction
Date: 2019
URI: https://ir.uitm.edu.my/id/eprint/97038
Edit Item
Edit Item

Download

[thumbnail of 97038.pdf] Text
97038.pdf

Download (12MB)

ID Number

97038

Indexing

Statistic

Statistic details