Abstract
Because the foundation is the most important aspect of a building structure, this report will go over the pile caps for the RC piles that were used in this project. This report was prepared for the pile cap for the piling of 282 piling points of the two-story clinic building, 88 piling points for quarters and 15 points for the electrical substation in Kepala Batas, Kedah. The purpose of this report is to determine the construction method for pile caps for a two-story clinic building, two units of quarters, and a one-unit electrical substation. This project involves the construction of public facilities in terms of health, which includes preliminary work, substructure, superstructure, architectural work, external work within the lot boundary, and infrastructure work. When illustrating the function of pile caps to the building structure, including the pile cap definition, materials used, construction method, and design that adhere to the Standard Specification for Building Works, there are several important aspects to be considered.
Metadata
Item Type: | Monograph (Industrial Training) |
---|---|
Creators: | Creators Email / ID Num. Tengku Mahusin, Tengku Ammar Hakim 2019296546 |
Contributors: | Contribution Name Email / ID Num. Thesis advisor Hadzaman, Nor Asma Hafizah UNSPECIFIED Thesis advisor Ismail, Dzulkarnaen UNSPECIFIED |
Subjects: | T Technology > TE Highway engineering. Roads and pavements > Construction details. Including foundations, maintenance, equipment T Technology > TH Building construction |
Divisions: | Universiti Teknologi MARA, Perak > Seri Iskandar Campus Universiti Teknologi MARA, Perak > Seri Iskandar Campus > Faculty of Architecture, Planning and Surveying |
Keywords: | Pile cap construction, Klinik Kesihatan |
Date: | 2022 |
URI: | https://ir.uitm.edu.my/id/eprint/93550 |