Abstract
The case study topic that I chose and fulfilled for my report was Precast Drawing and Construction at Starbucks, Discovery Park. This report included with the introduction, the company background of the company that I interned. My objectives have been achieved as I was to carry out my practical training, obtain experience in the operation that I was in as well as execute my case study report. The study method that I used throughout this project was by interview boss and engineers relating to data collection and document reviews that I have acquired from the staff and some engineers and also from my research. By the end of my practical training, I have reached a deeper apprehension towards the role of this profession. Furthermore, with this task and the duration of my internship, I am grateful cause have opportunity to intern at this company. They a very kind to me and other intern student, they always give advice and teach new thing about construction and structure design to us. Last but not least, I gain so much acknowledge from this company.
Metadata
Item Type: | Monograph (Industrial Training) |
---|---|
Creators: | Creators Email / ID Num. Mohamad, Siti Nur Farzana 2019204798 |
Contributors: | Contribution Name Email / ID Num. Thesis advisor Hadzaman, Nor Asma Hafizah UNSPECIFIED Thesis advisor Ismail, Dzulkarnaen UNSPECIFIED |
Subjects: | T Technology > TE Highway engineering. Roads and pavements > Construction details. Including foundations, maintenance, equipment T Technology > TH Building construction |
Divisions: | Universiti Teknologi MARA, Perak > Seri Iskandar Campus Universiti Teknologi MARA, Perak > Seri Iskandar Campus > Faculty of Architecture, Planning and Surveying |
Keywords: | Precast drawing, Construction |
Date: | 2022 |
URI: | https://ir.uitm.edu.my/id/eprint/93470 |