Abstract
Extension of time is a common thing in construction projects. This report will discuss about the process of extension of time based on ‘Projek Pembinaan Bangunan Tambahan 6 Bilik Darjah Dan Lain-Lain Kemudahan Di Sekolah Kebangsaan Kedaik, Rompin, Pahang’. The parties involved in this project are Zana Bina Sdn Bhd, JKR Daerah Rompin, and other sub-contractors. Zana Bina Sdn Bhd as the main contractor has applied for extension of time due to the retaining wall. However, due to the delay of JKR Daerah Rompin in giving the final words, it further strengthens Zana Bina Sdn Bhd to get extension of time for the project. Therefore, the main objectives are to investigate the reason of extension of time, to identify the clauses of extension of time in Contract Document by JKR, and to determine the procedure to apply extension of time. The collected data regarding extension of time obtained from observation, interview, and document reviews during practical training at Zana Bina Sdn Bhd. This report can be as a guide for construction company on how to apply for extension of time in a right way in upcoming projects.
Metadata
Item Type: | Monograph (Industrial Training) |
---|---|
Creators: | Creators Email / ID Num. Adzmi, Seri Nuraliah 2019296934 |
Contributors: | Contribution Name Email / ID Num. Thesis advisor Hadzaman, Nor Asma Hafizah UNSPECIFIED Thesis advisor Ismail, Dzulkarnaen UNSPECIFIED |
Subjects: | T Technology > TE Highway engineering. Roads and pavements > Construction details. Including foundations, maintenance, equipment T Technology > TH Building construction |
Divisions: | Universiti Teknologi MARA, Perak > Seri Iskandar Campus Universiti Teknologi MARA, Perak > Seri Iskandar Campus > Faculty of Architecture, Planning and Surveying |
Keywords: | Construction works |
Date: | 2022 |
URI: | https://ir.uitm.edu.my/id/eprint/93441 |