Construction of floor for International School (Phase 2a), Horizon Hills / Nur Hafizah Youszelan

Youszelan, Nur Hafizah (2022) Construction of floor for International School (Phase 2a), Horizon Hills / Nur Hafizah Youszelan. Industrial Training. Universiti Teknologi MARA UiTM,Perak.

Abstract

We as student of Degree in Building Survey are required to gain some experienced Industrial Training at any firm or company that are related with our requirement. The main aim or objective for this training is to ensure that all students get to know ell and expose to the real work of environment experience at the same time teach us on how to cope with various of professional and experts. Besides, this practical training will develop our skills in management of time and working schedule, communication and others. Therefore, every student must prepare a practical report that related with the training task. Thus, this report are related to construction of International School that still undergoing at Horizon Hills, Iskandar Puteri, Johor. Due to Pandemic of Covid-19, the construction progress might not be able to finish on time and this report only consists of construction progress. Limitation to join other workers to go to site also one of the main reasons for not be able to make a full report until post construction.

Metadata

Edit Item
Edit Item

Download

[thumbnail of 91895.pdf] Text
91895.pdf

Download (1MB)

ID Number

91895

Indexing

Statistic

Statistic details