Abstract
The Kota Tinggi Vocational High School has been in establishment since 2007, and the majority of the school structures have not been upgraded. The Ministry of Education and the school administration want to upgrade by adding four new school blocks for the comfort of students and staff in October 2020. The precise procedure of concreting works is discussed in this paper. As a result, the focus of this paper will be on the technique of reinforced concrete framed column construction. The purpose of this report is to look at the RC Column technique and the devices used to complete the progress immediately, as well as to determine the problems occurred during construction and solution taken to solve them. Overall, this strategy will aid in the construction of structures that can handle loads and reinforce the structure in terms of comfort and support. This is due to the fact that if the RC Column is built according to the specifications, there will be no concrete deterioration issues for a long period of time. Not only that, but the existence of this RC Column will also eliminate the issue of defects.
Metadata
Item Type: | Monograph (Industrial Training) |
---|---|
Creators: | Creators Email / ID Num. Rahimie, Nur Farzana Ayina 2019412798 |
Contributors: | Contribution Name Email / ID Num. Thesis advisor Abd Rashid, Mohd Najib UNSPECIFIED Thesis advisor Hadzaman, Nor Asma Hafizah UNSPECIFIED Thesis advisor Ismail, Dzulkarnaen UNSPECIFIED |
Subjects: | T Technology > TH Building construction T Technology > TH Building construction > Construction equipment in building |
Divisions: | Universiti Teknologi MARA, Perak > Seri Iskandar Campus Universiti Teknologi MARA, Perak > Seri Iskandar Campus > Faculty of Architecture, Planning and Surveying |
Keywords: | Kota Tinggi Vocational High School, reinforced concrete |
Date: | 2022 |
URI: | https://ir.uitm.edu.my/id/eprint/87649 |
Download
87649.pdf
Restricted to Registered users only
Download (161kB)