Implementation of green 5s manual in construction work at Perla Ara Sentral Site / Nur Amirah Roslim

Roslim, Nur Amirah (2022) Implementation of green 5s manual in construction work at Perla Ara Sentral Site / Nur Amirah Roslim. Industrial Training. Universiti Teknologi MARA UiTM,Perak. (Unpublished)

Abstract

Green 5S is one of the plan that has been introduced by Malaysian government, SIRIM in order to develop green building in all Malaysian construction industry. This system helps resolving environmental pollution thus improving the productivity of staffs and maintaining the work efficiency in workplace by taking some corrective/preventive action. This report was conducted for the Perla apartment project in Ara Damansara, Selangor. The objective of this report is to investigate the methods on how the Green 5S Manual being implemented in construction site. By knowing the method of implementation, Green 5S can be practiced properly and delivered by everyone in the right way. To achieve the main objective of this report, document analysis, interview and observation are needed.

Metadata

Item Type: Monograph (Industrial Training)
Creators:
Creators
Email / ID Num.
Roslim, Nur Amirah
2019285564
Contributors:
Contribution
Name
Email / ID Num.
Thesis advisor
Ahmad, Ezzat Fahmi
UNSPECIFIED
Thesis advisor
Hadzaman, Nor Asma Hafizah
UNSPECIFIED
Thesis advisor
Ismail, Dzulkarnaen
UNSPECIFIED
Subjects: T Technology > TH Building construction
T Technology > TH Building construction > Construction equipment in building
Divisions: Universiti Teknologi MARA, Perak > Seri Iskandar Campus
Universiti Teknologi MARA, Perak > Seri Iskandar Campus > Faculty of Architecture, Planning and Surveying
Keywords: construction industry, Malaysian government
Date: 2022
URI: https://ir.uitm.edu.my/id/eprint/87578
Edit Item
Edit Item

Download

[thumbnail of 87578.pdf] Text
87578.pdf

Download (457kB)

ID Number

87578

Indexing

Statistic

Statistic details