Abstract
Contracts provide duties and obligations the parties have agreed to but also provides protections for the parties if they fail to abide by their obligations. Construction contracts include details about the project and the work that will be done and how compensation will be handled related to the project. When a contract has been breached by one of the parties, the other party will have important legal remedies to consider. The report describes the details of the contract document to construct a bungalow on Lot 6980, Lorong Stadium, Taman Pegawai Kanan Kerajaan, Mukim Asam Kumbang, Taiping, Perak Darul Ridzuan. The project are based on the the company of Nuliasyar Construction Sdn Bhd where located at Kamunting, Perak. The contract also has been changes due to the several reason and give some impact on the overall project.
Metadata
Item Type: | Monograph (Industrial Training) |
---|---|
Creators: | Creators Email / ID Num. Idris, Noor Fatehah 2019666266 |
Contributors: | Contribution Name Email / ID Num. Thesis advisor Mohd Latif, Hafizah UNSPECIFIED Thesis advisor Hadzaman, Nor Asma Hafizah UNSPECIFIED Thesis advisor Ismail, Dzulkarnaen UNSPECIFIED |
Subjects: | T Technology > TH Building construction T Technology > TH Building construction > Construction equipment in building |
Divisions: | Universiti Teknologi MARA, Perak > Seri Iskandar Campus Universiti Teknologi MARA, Perak > Faculty of Architecture, Planning and Surveying |
Keywords: | Contract administration |
Date: | 2022 |
URI: | https://ir.uitm.edu.my/id/eprint/87229 |
Download
87229.pdf
Restricted to Registered users only
Download (250kB)