Finishes work at water features roundabout / Muhammad Nur Aiman Hakimi Mohd Hanafiah

Mohd Hanafiah, Muhammad Nur Aiman Hakimi (2022) Finishes work at water features roundabout / Muhammad Nur Aiman Hakimi Mohd Hanafiah. Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Abstract

Industrial training give many benefits for the students to gain working experience. The students will be given 20 weeks to complete their industrial training during semester 5 diploma in building. I had be chosen to do my industrial training at Gabungan Strategik Berhad and will be supervised by landscape supervisor, Encik Amir bin Adam and Puan Syifa Binti Awaluddin. Observation and supervision of workers are the ways utilized to accomplish this. This is done when the employees are at work. Reviewing documents and interviewing supervisors and subcontractors are also methods for completing the report's goal. Finally, there are different types of finishes at water features roundabout, each with its own purpose and function in completing the landscape in Pusat Pentadbiran Sultan Ahmad Shah.

Metadata

Item Type: Monograph (Industrial Training)
Creators:
Creators
Email / ID Num.
Mohd Hanafiah, Muhammad Nur Aiman Hakimi
2019296988
Contributors:
Contribution
Name
Email / ID Num.
Thesis advisor
Zaharuddin, Wan Akmal Zahri
UNSPECIFIED
Thesis advisor
Hadzaman, Nor Asma Hafizah
UNSPECIFIED
Thesis advisor
Ismail, Dzulkarnaen
UNSPECIFIED
Subjects: T Technology > TH Building construction > Management of the construction site. Superintendence of building construction
Divisions: Universiti Teknologi MARA, Perak > Seri Iskandar Campus > Faculty of Architecture, Planning and Surveying
Keywords: finishes work, water features roundabout, landscape
Date: 2022
URI: https://ir.uitm.edu.my/id/eprint/87195
Edit Item
Edit Item

Download

[thumbnail of 87195.PDF] Text
87195.PDF

Download (1MB)

ID Number

87195

Indexing

Statistic

Statistic details