The post-construction process for new building of SSM Perak / Muhammad Najwan Razak

Razak, Muhammad Najwan (2022) The post-construction process for new building of SSM Perak / Muhammad Najwan Razak. Industrial Training. Universiti Teknologi MARA, Perak. (Unpublished)

Abstract

This report summarizes the process of post-construction, from completing all punch list items until the final process of post-construction. It is the result of five months of internship experience. The goal of this study is to outline the stages involved in post-construction process. There are two research methodologies used in this study to obtain more information about the process which is primary and secondary. There are two types of primary research which observation and interviews. Observations were made by referring to previous tender papers and related document. In addition, during the interview, I connected with someone who has prior expertise with the process of post-construction. The procedures of all the post-construction process are outlined in this report.

Metadata

Item Type: Monograph (Industrial Training)
Creators:
Creators
Email / ID Num.
Razak, Muhammad Najwan
2019417838
Contributors:
Contribution
Name
Email / ID Num.
Thesis advisor
Hadzaman, Nor Asma Hafizah
UNSPECIFIED
Thesis advisor
Hadzaman, Nor Asma Hafizah
UNSPECIFIED
Thesis advisor
Ismail, Dzulkarnaen
UNSPECIFIED
Subjects: T Technology > TH Building construction
T Technology > TH Building construction > Construction equipment in building
Divisions: Universiti Teknologi MARA, Perak > Seri Iskandar Campus
Universiti Teknologi MARA, Perak > Seri Iskandar Campus > Faculty of Architecture, Planning and Surveying
Keywords: post-construction process, new building,
Date: 2022
URI: https://ir.uitm.edu.my/id/eprint/86053
Edit Item
Edit Item

Download

[thumbnail of 86053.PDF] Text
86053.PDF
Restricted to Registered users only

Download (1MB)

ID Number

86053

Indexing

Statistic

Statistic details