Abstract
The primary goal of this study is to identify the building maintenance procedure performed by Setiakon Builders Sdn. Bhd. throughout the defect liability period (D.L.P.) with reference to their projects. In this work, a variety of case study techniques were employed to gather and analyse data. This includes doing a site visit and interviewing Setiakon Builders Sdn. Bhd. employers and employee, such as their site supervisor, as well as their client, Thriven Global Berhad. Extracted data from books, theses, the internet, and forms relating to the building maintenance procedure throughout the Defect Liability Period (D.L.P.) were also used in the researchThe overall conclusion of the case studies demonstrates that construction faults develop often in the absence of effective building care. This article discusses how to handle building maintenance throughout the defect liability period in a more effective and efficient manner. This helps to guarantee that the building maintenance procedure is organised and efficient during the works. It gives excellent knowledge in addressing building defects for academics. This study will most likely serve as guidelines for managing building maintenance throughout the period in the future. This study expands on previous studies and has ramifications for Setiakon Builders Sdn. Bhd. efforts in managing building maintenance during the Defect Liability Period (D.L.P.). It provides essential information and instructions that, ideally, will assist other contractors and developers in doing better building maintenance management
Metadata
Item Type: | Monograph (Industrial Training) |
---|---|
Creators: | Creators Email / ID Num. Mohd Yusni, Muhammad Khaidir 2019343851 |
Contributors: | Contribution Name Email / ID Num. Thesis advisor Ibrahim, Azira UNSPECIFIED Thesis advisor Mahyuddin, Muhammad Naim UNSPECIFIED Thesis advisor Ismail, Dzulkarnaen UNSPECIFIED |
Subjects: | T Technology > TH Building construction > Maintenance and repair |
Divisions: | Universiti Teknologi MARA, Perak > Seri Iskandar Campus > Faculty of Architecture, Planning and Surveying |
Keywords: | building maintenance process, defects liability period, construction |
Date: | 2021 |
URI: | https://ir.uitm.edu.my/id/eprint/86050 |