Industrialised building system: precast concrete wall / Muhammad Idlan Harith Haidir

Haidir, Muhammad Idlan Harith (2022) Industrialised building system: precast concrete wall / Muhammad Idlan Harith Haidir. Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Abstract

Industrialised Building System is a system that been introduced around 1960s in Malaysia where it is built in sections manufactured from designated specifications within a factory, and then assembled at the point of construction. This report was conducted for the building that involves on using Industrialised Building System. The objective of report is to study on installation, repairs and maintenance on Industrialised Building System as they are important processes on IBS method. The observation and interviews were completed as giving more information on the processes how they install, repair, and maintain the IBS method.

Metadata

Item Type: Monograph (Industrial Training)
Creators:
Creators
Email / ID Num.
Haidir, Muhammad Idlan Harith
2019281626
Contributors:
Contribution
Name
Email / ID Num.
UNSPECIFIED
Talkis, Nor Azizah
UNSPECIFIED
UNSPECIFIED
Hadzaman, Nor Asma Hafizah
UNSPECIFIED
UNSPECIFIED
Ismail, Dzulkarnaen
UNSPECIFIED
Subjects: T Technology > TH Building construction > Systems of building construction. Industrialized building
Divisions: Universiti Teknologi MARA, Perak > Seri Iskandar Campus > Faculty of Architecture, Planning and Surveying
Keywords: Industrialised Building System, precast concrete wall, installation
Date: 2022
URI: https://ir.uitm.edu.my/id/eprint/85949
Edit Item
Edit Item

Download

[thumbnail of 85949.pdf] Text
85949.pdf

Download (1MB)

ID Number

85949

Indexing

Statistic

Statistic details