Abstract
The aim of this study is to solve the Unit Commitment Problem with Solar Plant using the Improved Evolutionary Programming technique. The objective of this study is to search for minimum operational cost while satisfying the ranging load demand, to compare the performance of Improve Evolutionary Programming with Evolutionary Programming before installing Solar Plant and after the installation. The constraints considered in this research include spinning reserve margin, load demand, power and reserve limit, and also start-up cost. The improved technique is based on conventional technique where, the only difference is that in the initialization process instead of generating 20 population this Improve Evolutionary Programming generating 100 populations to have a wide range of data and from this it will select the best possible data combination.
Metadata
Item Type: | Thesis (Degree) |
---|---|
Creators: | Creators Email / ID Num. Hassan, Mohamad Izazuddin 2010870326 |
Contributors: | Contribution Name Email / ID Num. Thesis advisor Che Othman, Muhammad Nazree UNSPECIFIED |
Divisions: | Universiti Teknologi MARA, Shah Alam > Faculty of Electrical Engineering |
Programme: | Bachelor of Electrical Engineering (Hons.) |
Keywords: | Solar plant, evolutionary programming, commitment |
Date: | 2013 |
URI: | https://ir.uitm.edu.my/id/eprint/85140 |
Download
85140.pdf
Download (3MB)