Defect liability period / Muhamad Zairi Hamdan

Hamdan, Muhamad Zairi (2022) Defect liability period / Muhamad Zairi Hamdan. Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Abstract

Defect liability period is the period contractor is liable to make good of the defects but how reasonable is the defects liability period to allow defects (patent and latent) This report the occurrence of defects during and after the defect liability period and the contractual terms of defects Malaysia, Malaysia were chosen as case study areas. Findings from the study revealed that 6months defects liability period practice in Malaysia is reasonable enough to allow defects to manifest within the period. whereas most of the defects manifestation often occur after the 3 months defect liability period which really poses a major threat on employers and amount to economic loss. The study suggests extension of defects liability in Malaysia so as to allow the employer to have value for money invested.

Metadata

Item Type: Monograph (Industrial Training)
Creators:
Creators
Email / ID Num.
Hamdan, Muhamad Zairi
2019678452
Contributors:
Contribution
Name
Email / ID Num.
UNSPECIFIED
Mohd Latif, Hafizah
UNSPECIFIED
UNSPECIFIED
Hadzaman, Nor Asma Hafizah
UNSPECIFIED
UNSPECIFIED
Ismail, Dzulkarnaen
UNSPECIFIED
Subjects: T Technology > TH Building construction > Building failures, errors, defects, etc.
Divisions: Universiti Teknologi MARA, Perak > Seri Iskandar Campus > Faculty of Architecture, Planning and Surveying
Keywords: defect liability period, contractor
Date: 2022
URI: https://ir.uitm.edu.my/id/eprint/84066
Edit Item
Edit Item

Download

[thumbnail of 84066.PDF] Text
84066.PDF

Download (506kB)

ID Number

84066

Indexing

Statistic

Statistic details