Abstract
This report briefly describes the methods and processes involved in the construction of slope stabilization which apply soil nailing system. It also explains the types of materials and machines used. This report was produced during the practical training within five months in the company Pembinaan Petasih Sdn. Bhd. This report is based on projects done in the district of Gombak. This project is under the supervision of JKR Gombak. For the methods of this slope stabilization, found that each of the work done is not as easy to execute. Each of the construction processes is done in detail to avoid error due to this construction project. In conclusion, it is hoped that this report can be explained in more detail to the reader about the installation of soil nailing system to provide slope stabilization.
Metadata
Item Type: | Monograph (Industrial Training) |
---|---|
Creators: | Creators Email / ID Num. Zamani, Muhammad Shah Redza 2009557825 |
Contributors: | Contribution Name Email / ID Num. Thesis advisor Mohamed Nordin, Rafizah UNSPECIFIED Thesis advisor Sulaiman, Azim UNSPECIFIED Thesis advisor Tun Jamil, Siti Jamiah UNSPECIFIED |
Subjects: | T Technology > TH Building construction > Building fittings and their installation |
Divisions: | Universiti Teknologi MARA, Perak > Seri Iskandar Campus > Faculty of Architecture, Planning and Surveying |
Keywords: | installation, soil nailing system, slope area |
Date: | 2011 |
URI: | https://ir.uitm.edu.my/id/eprint/80501 |