Abstract
This practical report mainly focuses on the method and constructions of precast box culvert and micro pile. Practical training on site constructions under Pakis Emas Capital Sdn Bhd for total five months has given outrageous experiences uncountable knowledge in completion of this report. For beginning, this report divided to several parts that starting with company background and project description. Based on the observation, precast box culvert is ready-to-use for placing of reinforcement unit and subsequently feeling the whole with grout to form micro pile. It is mainly used in precast box culvert for area large such as rivers. It also has a testing group that will help to correct weak surface defects and resultant loss in surface land and durability within this report multi-level and complicated process will be briefly discussed on contractions. For instance, advantages and methods of construction will be explained throughout this report. Finally, suggestions and precaution step are taken to overcome problems that occur.
Metadata
Item Type: | Monograph (Industrial Training) |
---|---|
Creators: | Creators Email / ID Num. Abdul Talib, Muhammad Radhi 2012426266 |
Contributors: | Contribution Name Email / ID Num. Thesis advisor Abdullah Halim, Anas Zafirol UNSPECIFIED Thesis advisor Wan Ali, Wan Nordiana UNSPECIFIED Thesis advisor Abdullah, Mohd Rofdzi UNSPECIFIED |
Subjects: | T Technology > TH Building construction > Building fittings and their installation |
Divisions: | Universiti Teknologi MARA, Perak > Seri Iskandar Campus > Faculty of Architecture, Planning and Surveying |
Keywords: | precast box culvert-micro pile, construction |
Date: | 2014 |
URI: | https://ir.uitm.edu.my/id/eprint/80462 |